Relocation works for PUB pipes-- Infrastructure works i.e main drain , relocation works for PUB pipes and piling for Tanjung Puteri Bridge are in progress

Infrastructure works i.e main drain and relocation works for PUB pipes are in progress.

Wisma Putra has clarified to us in a---Minister for Foreign Affairs George Yeo's Remarks in Parliament on 2 March 2006 on the Half-Bridge
TPN(Third Party Note) that Malaysia remains committed to negotiations for a full bridge and only soil studies are being conducted. 04/03/2006 march
http://www.gerbangperdana.com.my/
BRIDGES COMPONENTS
The project also consists of the construction of road and railway bridges to replace the Causeway. The removal ofthe Causeway will be followed by the dredging of a navigation channel to allow passage of vessels.
RELOCATION OF WATER MAINS
Existing Water Mains, which are routed along Jalan Bukit Chagar, have been relocated to facilitate the construction of the CIQ Complex, while the Water Mains along Jalan Jim Quee have been relocated to facilitate the construction of JB Sentral and internal roads. In addition to the diversion of the major Water Mains, other SAJ Water Mains serving the surrounding areas have also been diverted and upgraded to serve the additional needs of the Integrated CIQ Complex and ancillary buildings.
The Water Mains running along the Causeway will be replaced with submarine pipes, and where necessary, the pipes will be protected by armour protection units. Cathodic protection will be applied to the submarine pipes to prevent corrosion.


I am convinced the bridge can be fully completed in 36 months. It will also conform with international standards and no problem will arise," he said.
Wisma Putra( MY's MFA)has clarified to us in a TPN that Malaysia remains committed to negotiations for a full bridge and only soil studies are being conducted.---MFA Spokesman's Comments:-Reactions of Malaysian Leaders on Minister for Foreign Affairs George Yeo's Remarks in Parliament on 2 March 2006 on the Half-Bridge

Hmm...can't see the railway at all...does it mean no more railway?Originally posted by lionnoisy:
fr PHOTO AND VIDEO
http://www.gerbangperdana.com.my/
AFAIK, underwater tunnel.Originally posted by maggot:Hmm...can't see the railway at all...does it mean no more railway?![]()
JOHOR BARU, Thurs.09 Mar 2006 The "scenic bridge" on the Malaysian side of the Tebrau Strait is expected to be operational from April 1, 2009.Deputy Works Minister Datuk Mohd Zin Mohamad said the 470m structure would adhere to international standards which required a gradient not exceeding six per cent for safety reasons.
"The bridge will be built with a gradient of only 4.25 per cent, but high enough for navigational purposes.
"We have set aside a buffer zone which will be two metres before the international boundary. This means the bridge will join the Malaysian side of the Causeway just before the boundary."
"In principle, there have been several agreements achieved. Now we need to go into the details and make the agreements final," Bernama quoted Malaysian Foreign Minister Syed Hamid Albar as saying in Malaysia's Johor state bordering Singapore.
When Sg asked them to get out of Keppel and relocate their Train Station were they cheated?Originally posted by lionnoisy:While Sg has been assured that '' only soil studies are being conducted'' ,
the PUB water pipes have been relocated for one year and it seems
pilings have been started for the crooked bridge.
Has Sg been cheated??
Maybe they want to take back singapore and join back to malaysia as a stateOriginally posted by NewAge:This thing is so sensitive. In WW2 the jap bomb bridge and railway as a excuse to war. Is the M trying to do the same. Destroy the bridge and cut our water supply.