Ohoh... That means Phrase I will become the Marina Line...Originally posted by iamgoondu:LTA had announced Downtown extension, to be completed in 2012.
Ya...Originally posted by Airbus330Captain:This is something i give a thumb up . Makes life easier for everyone needs to get there.
Wonder now will they be build eventually...Originally posted by tranquilice:The location map shows that Millenia will be the terminating station for Bukit Timah line (BTL) while Eastern Regional line (ERL) will continue from DTE Chinatown station.
The main purpose of building DTE is to bring people to the Integrated Resort aka Casino.
Landmark station is near Raffles Quay. The station next to the casino is Bayfront.Originally posted by sbs&tibs:Hmm...I find it a good idea!But I don't think it is an extension. From Millenia to Chinatown via Bayfront, Landmark and Cross St. Millenia and Chinatown will be Interchange stns. Landmark is situated next to the future casino are.
Yes, that's CCL phase 6 but DTE is another MRT line.Originally posted by iveco:Wasn't the CCL supposed to link HBF with MRB originally?
But eventually, linked with to be runned by SMRT CCLOriginally posted by tranquilice:Yes, that's CCL phase 6 but DTE is another MRT line.
Isn't Marina line current CCL phase 1?Originally posted by sbst275:Ohoh... That means Phrase I will become the Marina Line...
But, that means CCL trains are over-stretched, with only 39 NEL sized trains to serve so long dist
I remembered it would be Marina Line when the HBF - Millennia/ Nicoll Highway (?)Originally posted by tranquilice:Isn't Marina line current CCL phase 1?
There was already plan in the past for a MRT line linking the city to the new downtown, while CCL phase 6 is to connect HarbourFront with Millenia. But there is a possibility that CCL phase 6 has been scrapped and secretly changed to DTE.Originally posted by 5454:i think the CCL Extension to Downtown is a very good idea.![]()
Maybe... In fact, it was reported in TODAY somewhen last mth, a line from CNT to the MarinaOriginally posted by tranquilice:There was already plan in the past for a MRT line linking the city to the new downtown, while CCL phase 6 is to connect HarbourFront with Millenia. But there is a possibility that CCL phase 6 has been scrapped and secretly changed to DTE.![]()
Yes, DTE will use trains from Kim Chuan depot (CCL) as the DTE tunnel will be connected to CCL tunnel at Millenia station.Originally posted by sbst275:But eventually, linked with to be runned by SMRT CCL
Might have train shortageOriginally posted by tranquilice:Yes, DTE will use trains from Kim Chuan depot (CCL) as the DTE tunnel will be connected to CCL tunnel at Millenia station.
The current CCL phase 1 (Dhoby Ghaut - Boulevard) was formerly called Marina line.Originally posted by sbst275:I remembered it would be Marina Line when the HBF - Millennia/ Nicoll Highway (?)
Yah... Because Phrase 2 and Phrase 6 will meet... Phrase 1 is a branchOriginally posted by tranquilice:The current CCL phase 1 (Dhoby Ghaut - Boulevard) was formerly called Marina line.
No, phase 1 and 6 will meet. Dhoby Ghaut to Millenia is the branch line of CCL.Originally posted by sbst275:Yah... Because Phrase 2 and Phrase 6 will meet... Phrase 1 is a branch
What NEL-sized trains?Originally posted by sbst275:Might have train shortage
39 NEL sized trains (78 CCL trains) for a 40km CCL...
While NEL has 25 trains for 20km NEL
If you still dunno,Originally posted by Superbus:What NEL-sized trains?
Yah, it is Millenia...Originally posted by tranquilice:No, phase 1 and 6 will meet. Dhoby Ghaut to Millenia is the branch line of CCL.