Wow the the map looks nice and good MRT routes.Originally posted by iamgoondu:
That's station NE2 on the NEL. It's currently un-named, don't know how it got the name Kampong Bahru when it's still unconfirmed where the station will be build exactly.Originally posted by iamgoondu:
The map which has been circulating around includes future rail lines which LTA has not announced the location of the stations yet. The author of the map draw out the future lines based on fantasy.Originally posted by laurence82:today TNP
LTA says a map has been circulating around in emails is fake
the map include lines that LTA says is doing research on, not even on the papers yet
preciselyOriginally posted by tranquilice:The map which has been circulating around includes future rail lines which LTA has not announced the location of the stations yet. The author of the map draw out the future lines based on fantasy.
Think that plan was shelved quite some time ago.Originally posted by iamgoondu:Is there a plan to have an extension of CCL from Harbourfront (CCL) to Marina Bay (North South line)? Thought Phase 5 is the last phase of CCL.
I couldn't recall any formal announcement on that. How I wish to have that link..Originally posted by iveco:Think that plan was shelved quite some time ago.![]()
Any proof on this? (that the map was edited by LTA)Originally posted by cck_190:Are you sure? In Wikipedia, not SGwiki, the map is said to have been made by the author incorrectly at first, but was then taken by LTA and edited.![]()
Reply from LTA:Originally posted by iamgoondu:Is there a plan to have an extension of CCL from Harbourfront (CCL) to Marina Bay (North South line)? Thought Phase 5 is the last phase of CCL.
MRT CIRCLE LINE STAGE 6 AND EASTERN REGION LINE
FEEDBACK NUMBER: 256157
Thank you for your feedback of 17-JUN-2005.
The Downtown Extension (DTE) is currently envisaged as a part of the Circle Line (CCL) with provisions for future extensions to the future Bukit Timah Line and the Eastern Region Line. As illustrated in the map by The Straits Times (Wednesday, 15 June 2005), these future lines are planned to be extended towards the northwest and eastern regions of Singapore, respectively.
The proposal is to extend the DTE towards the east from Chinatown Station in order to link with CCL MacPherson Station and Kim Chuan Depot. This would also allow DTE and future extensions of this line access to Kim Chuan Depot.
Given the current pace of development in the central area, CCL Stage 6 will only be needed in the longer term to support developments in south-western central area.
Thank you for your interest in rail transportation in Singapore.
It was postponed, not shelved.Originally posted by iveco:Think that plan was shelved quite some time ago.![]()
Sorry, my mistake. I re-read the article and i read wrongly at first. Really sorryOriginally posted by tranquilice:Any proof on this? (that the map was edited by LTA)
I first saw it in SGWIKI MRT and it was quite impressive but there are some notes that it shouldnt be taken to be real.Originally posted by Apex-LW'21:This is the map that you might be talking about:
http://upload.wikimedia.org/wikipedia/commons/7/76/Systemmaps.png
The SGWIKI said that the Future MRT Map does not assume its accruacy especially with the future lines and their operators.Originally posted by SBS9889U:I first saw it in SGWIKI MRT and it was quite impressive but there are some notes that it shouldnt be taken to be real.
I heard of NS6 Sungei Kudut, but NS12 supposely to be named Carbbera and no NS28. And CC30 and CC31 never heard before.Originally posted by Apex-LW'21:The map also has the 'proposed' NSL Stations:
NS6 - Sungei Kadut
NS12 - Simpang
NS28 - Marina View
There is also a Circle Line Station connecting to Marina Bay:
CC30 - Shenton
CC31 - Marina Bay
The official LTA maps shows only 29 Circle Line Stations.