any progress on Joon Koon Terminal yet?
Originally posted by JaSoNhSu92:this is the "box" at level 3 JP2(outside Fairprice Xtra)
I saw it too... but that's on the 3rd floor..and the interchange is at the basement...
I spotted another entrance to the bus interchange somewhere the ground level.
Originally posted by JaSoNhSu92:this is the "box" at level 3 JP2(outside Fairprice Xtra)
Originally posted by lianamaster:I saw it too... but that's on the 3rd floor..and the interchange is at the basement...
I spotted another entrance to the bus interchange somewhere the ground level.
That's the "direct" escalator to/from JP2/Boon Lay Bus Int on Level 3, it's cover up currently to prevent people from falling through the gap.
Level 1 has 3 such notices; 1-beside Dano, 2-beside M)phosis, 3-beside Viva Money Changer
Originally posted by brotherchen1982:That's the "direct" escalator to/from JP2/Boon Lay Bus Int on Level 3, it's cover up currently to prevent people from falling through the gap.
Level 1 has 3 such notices; 1-beside Dano, 2-beside M)phosis, 3-beside Viva Money Changer
i don't really read you?
Originally posted by sbs8104h:i don't really read you?
According to the pic shown, there would be an escalator installed there in the future. People can get to there(near fairprice Xtra) from the int. The pic is taken at the 3rd floor but the int is at the 1st floor. There is no 2nd floor. Other places where you see the notice are the entrance/exit of the future A/C int. Professional mentioned that it is a smart decision by JP as people who need to passby JP from int to MRT station.
March or April i think
Originally posted by brotherchen1982:That's the "direct" escalator to/from JP2/Boon Lay Bus Int on Level 3, it's cover up currently to prevent people from falling through the gap.
Level 1 has 3 such notices; 1-beside Dano, 2-beside M)phosis, 3-beside Viva Money Changer
theres a gap XD
Originally posted by SBS n SMRT:Some routes that may beat or par with MRT
Service 168 (Woodlands-Tampinies)
Service 31-2 (TPY-Bedok)
Service 87 (Sengkang-Bedok)
Service 36 (Dhoby Ghaut-CGA)
161 sengkang to woodlands?
105 serangoon to TPY? :P
159 or 163 (take ur pick) TPY to sengkang?
53 CGA to Pasir Ris to Serangoon :D
oh and... 985 bt batok to tpy? :P
Originally posted by Khairiano:Oh okey.. Btw..
Anything change at Joo Koon Terminal?
what change you're talking about....
Originally posted by ^tamago^:Seems like the interchange will not open in tandem with the opening of the BLE.
Think they want to launch The Centris Condo first.
Originally posted by Khairiano:I wonder when is 3rd Quarter 2009??
Jun to jul?? Hmm
use ur maths. each quarter = 3 months. therefore 3rd quarter is jul aug sep
Originally posted by brotherchen1982:Think they want to launch The Centris Condo first.
maybe joint launch
The progess of the condo is delayed..
Originally posted by ^tamago^:
what change you're talking about....
the progress of the Joo Koon Terminal.
dunno whether that place has started modifying alrdy..
Originally posted by JaSoNhSu92:
the progress of the Joo Koon Terminal.dunno whether that place has started modifying alrdy..
my last visit in end Nov 08 showed zero progress there. Refer to earlier posts in this thread (IIRC) for the update.
Originally posted by Oceane:
I'm very sure the owners of Big Mac Centre wouldn't want to give away such a good business spot...
the business is good only at the 1st floor. i've recalled the 2nd and 3rd floor of the big mac centre had several changes of shop ownerships over the decade, some of which not even lasting a year. even recently the shop n save on the 2nd floor which had been there for near a decade had closed down. ever since amk hub opened, the businesses of the shops at the 2nd floor and 3rd floor has been dropping though stable enough for them not to close down.
Originally posted by BusSpeeder:the business is good only at the 1st floor. i've recalled the 2nd and 3rd floor of the big mac centre had several changes of shop ownerships over the decade, some of which not even lasting a year. even recently the shop n save on the 2nd floor which had been there for near a decade had closed down. ever since amk hub opened, the businesses of the shops at the 2nd floor and 3rd floor has been dropping though stable enough for them not to close down.
erm he said owners, not tenants.
Originally posted by Khairiano:I wonder when is 3rd Quarter 2009??
Jun to jul?? Hmm
3rd Quarter 2009 / Jul - Sep 2009.
Originally posted by sbst272:
3rd Quarter 2009 / Jul - Sep 2009.
oh.. okey...
Originally posted by jayh272416:use ur maths. each quarter = 3 months. therefore 3rd quarter is jul aug sep
okey.. sorry uh gag.. my maths half pass 6 uh.. =)
maths failed..
Originally posted by service_238:
erm he said owners, not tenants.
sorry, misinterpreted his points.
Originally posted by brotherchen1982:That's the "direct" escalator to/from JP2/Boon Lay Bus Int on Level 3, it's cover up currently to prevent people from falling through the gap.
Level 1 has 3 such notices; 1-beside Dano, 2-beside M)phosis, 3-beside Viva Money Changer
Ok.. I would like to try the Suntec style escalator then...