btw any idea whats with all the barriers and works around jurong east int. not the BIG BOX one.
Originally posted by SBS9888Y:btw any idea whats with all the barriers and works around jurong east int. not the BIG BOX one.
jurong east MRT is goin to remodify.
Originally posted by SBS9888Y:btw any idea whats with all the barriers and works around jurong east int. not the BIG BOX one.
Should be for the JEMP...LTA starting ground works already~ ![]()
Originally posted by QX179R:office plus shopping mall all in 1..
heard dat one of the tenants gonna be amore fitness (unisex)..
heard dat swimming pools will be on the top floor (sure very cold) and two levels food court plus topshop n topman and those expensive stuff stores. And got a 'river' for those toddlers to play with boats and stuff like that.
no link, what u say got swimming pools... they will be just wasting space and water!!!!!!! at which building of top floor
it is the upcoming tampines1 shopping mall
Originally posted by Tilldeath23:no link, what u say got swimming pools... they will be just wasting space and water!!!!!!! at which building of top floor
aiyo. you westsider ar? u tot tamp int got swimming pools?? lol!
Originally posted by ftjj0298:heard dat swimming pools will be on the top floor (sure very cold) and two levels food court plus topshop n topman and those expensive stuff stores. And got a 'river' for those toddlers to play with boats and stuff like that.
the swimming pool is at the fifth floor. amore fitness will be operating it, with other fitness services it provides.
Originally posted by BusSpeeder:the swimming pool is at the fifth floor. amore fitness will be operating it, with other fitness services it provides.
ya. It's on wikipedia and the main website of Tamp1, www.tampines1.com.sg
The berth 9 is finishing soon & i think opening nxt wk.
Originally posted by TownLink 291:The berth 9 is finishing soon & i think opening nxt wk.
8 or 9?
Originally posted by ftjj0298:
8 or 9?
Berth 9.
Buses: 19,29,291 (West Loop)
currently they close two berths at a time. In the next round i think they no choice have to close either one berth (65,22,293 or 37,69,291) at a time. If not no space to walk liao.
and i wonder wat is happening outside the int area (some distance away from under the mrt track).
Originally posted by 28_29_293:and i wonder wat is happening outside the int area (some distance away from under the mrt track).
Soil Investigation??
Hmm... maybe they building something or expanding the int in the future? (Or is it for DTL Stage 3?)
if i'm not wrong, they are checking to see if there's any soil subsidence