Originally posted by sbst275:
it's actually ok. not tat many cars are using itMore problematic is tat Jurong West Central 2 tat 157 & 198 now using en - route BNL
Actually, there's another entrance for cars.
Seriously, JWC2 and 3 need road widening.
Originally posted by lianamaster:Actually, there's another entrance for cars at JWC 3.
Seriously, JWC2 and 3 need road widening.
got meh? tat is centris car park si boh?
Originally posted by sbst275:
got meh? tat is centris car park si boh?
Boh.
Really got.
Next to Centris.
temporary int can conver into carpark liao
thought Central 2 & West St 64 nia?
Originally posted by Khairiano:temporary int can conver into carpark liao
But 179 and 199 are using right?
Originally posted by Khairiano:temporary int can conver into carpark liao
Sv 179, 179A & 199 still using leh
now good. alight ppl riao, move off to e parking bay. departure time move off, filter left reach boarding berth le
i mean after 179/179a and 199 moved
Originally posted by sbst275:thought Central 2 & West St 64 nia?
Paiseh man, I got the street name wrong.
Yup, it's West St 64, next to Centris.
Originally posted by Khairiano:i mean after 179/179a and 199 moved
now it remains to be seen if it can clear tml
alrdy today got bus svs w/ parking prob
Originally posted by Khairiano:temporary int can conver into carpark liao
I want JP3!
Originally posted by TIB1232Z:SBS8625X on 242 broke down at the exit at about 2pm.
Which... caused a mini jam at the exit loh.
hehe, recovery truck standby at old int.
Largest air-conditioned bus interchange in Boon Lay begins operations
SINGAPORE : The largest air-conditioned bus interchange in Singapore opened its doors to passengers on Sunday.
Spanning four football fields, the interchange is also the first Integrated Public Transport Hub to be located in the West.
It is all systems go at the new Boon Lay bus interchange, located along Jurong West Central 3.
Integrated with nearby retail mall Jurong Point, commuters can now shop, dine and hop on a bus, all under one roof.
It takes about three minutes to walk from the furthest bus berth to the nearby Boon Lay MRT station.
Many commuters have welcomed the change, after using a temporary bus interchange for more than three years.
One commuter said: "It is much better than the last one, because it is air-conditioned, and it looks much nicer."
Another commented: "The new interchange, very nice, very big and very comfortable because (it is) air-conditioned."
A third noted: "(It is) easy to find and comfortable."
Spanning some 20,000 square metres, the bus interchange in said to be
Singapore's busiest, with 30 bus services operating from its berths,
and more than 100,000 people are expected to use the interchange every
day.
So the operator has taken steps to ensure human traffic flows smoothly.
Ang Wei Neng, vice-president, West District, SBS Transit, said: "We
have been preparing for the past few months, so we have chosen the date
to open on a Sunday and a school holiday so that the crowd is not so
intense.
"(In preparation for) normal weekdays especially on January 4, when
school reopens, we have more people deployed these few days to give out
brochures, telling the customers and passengers where to find the buses
and the different berths."
Bus services 179,179A and 199, which have heavy passenger volumes, will still operate at the temporary interchange for now.
The services will be moved to this new facility by the first quarter of next year.
The new Boon Lay bus interchange is similar to the first three
air-conditioned bus interchanges in Toa Payoh, Sengkang and Ang Mo Kio.
All are equipped with automatic sliding doors for the convenience and
safety of passengers.
Separately, the Land Transport Authority said six more Integrated
Public Transport Hubs will be built over the next 10 years, with those
at Serangoon and Clementi expected to be completed in 2011. - CNA/ms
http://www.channelnewsasia.com/stories/singaporelocalnews/view/1027165/1/.html
English news showed UD 178
Chinese news mentioned it's NTU svs not moving simply due to ultra high ridership. 10,000 is e figure given
Originally posted by sbst275:CNA news video boleh!
Started e video clip w/ Sv 178 UD at alighting bay!
ch 8 news started with a OC on 172 at same place also! ![]()
Originally posted by JaSoNhSu92:
ch 8 news started with a OC on 172 at same place also!
new bus nvm
UD ![]()
UD rocks big time.
probably last time UD on TV
I saw 1 179 BC do stunt in front of the camera in ch8 news.
Originally posted by sbst272:Largest air-conditioned bus interchange in Boon Lay begins operations
SINGAPORE : The largest air-conditioned bus interchange in Singapore opened its doors to passengers on Sunday.
Spanning four football fields, the interchange is also the first Integrated Public Transport Hub to be located in the West.
It is all systems go at the new Boon Lay bus interchange, located along Jurong West Central 3.
Integrated with nearby retail mall Jurong Point, commuters can now shop, dine and hop on a bus, all under one roof.
It takes about three minutes to walk from the furthest bus berth to the nearby Boon Lay MRT station.
Many commuters have welcomed the change, after using a temporary bus interchange for more than three years.
One commuter said: "It is much better than the last one, because it is air-conditioned, and it looks much nicer."
Another commented: "The new interchange, very nice, very big and very comfortable because (it is) air-conditioned."
A third noted: "(It is) easy to find and comfortable."
Spanning some 20,000 square metres, the bus interchange in said to be Singapore's busiest, with 30 bus services operating from its berths, and more than 100,000 people are expected to use the interchange every day.
So the operator has taken steps to ensure human traffic flows smoothly.
Ang Wei Neng, vice-president, West District, SBS Transit, said: "We have been preparing for the past few months, so we have chosen the date to open on a Sunday and a school holiday so that the crowd is not so intense.
"(In preparation for) normal weekdays especially on January 4, when school reopens, we have more people deployed these few days to give out brochures, telling the customers and passengers where to find the buses and the different berths."
Bus services 179,179A and 199, which have heavy passenger volumes, will still operate at the temporary interchange for now.
The services will be moved to this new facility by the first quarter of next year.
The new Boon Lay bus interchange is similar to the first three air-conditioned bus interchanges in Toa Payoh, Sengkang and Ang Mo Kio. All are equipped with automatic sliding doors for the convenience and safety of passengers.
Separately, the Land Transport Authority said six more Integrated Public Transport Hubs will be built over the next 10 years, with those at Serangoon and Clementi expected to be completed in 2011. - CNA/mshttp://www.channelnewsasia.com/stories/singaporelocalnews/view/1027165/1/.html
six more integrated... wad are the other 4? bedok and tampines are included right?
Originally posted by chickenlittle2:I saw 1 179 BC do stunt in front of the camera in ch8 news.
how can the 179 BC step in new int when his designated service is still at old one?
Originally posted by chickenlittle2:I saw 1 179 BC do stunt in front of the camera in ch8 news.
![]()
Originally posted by JaSoNhSu92:
how can the 179 BC step in new int when his designated service is still at old one?
cos he doing svc 242 today. SBS 9121B.
Originally posted by chickenlittle2:
cos he doing svc 242 today. SBS 9121B.
then say so lor
Saw the West District GM having a standup meeting with his green men near the 198 berth this afternoon.