AMDEP - might be retained.
ARBP - might be replaced by Ulu Pandan Package.
BBDEP - might be retained.
BNDEP - might be replaced by Changi Package.
BRBP - might be retained.
CGBP - might be replaced by Changi Package.
HGDEP - might be replaced by Kim Chuan Package.
KJDEP - might be replaced by Gali Batu Package.
SLBP - might be replaced by Tuas Package.
WLDEP/WPDEP - might be replaced by Mandai Package.
Originally posted by BusAnalayzer:Location is 3A woodlands Square. Need to map it and see. Hopefully not far from MRT.
It's just behind Woodlands MRT Station. From the looks of it, the walking distance is about the same as walking between the Boon Lay Bus Interchange alighting bay and end-on berths), and the Boon Lay MRT Station front fare gates.
Originally posted by TPS Timothy Mok:AMDEP - might be retained.
ARBP - might be replaced by Ulu Pandan Package.
BBDEP - might be retained.
BNDEP - might be replaced by Changi Package.
BRBP - might be retained.
CGBP - might be replaced by Changi Package.
HGDEP - might be replaced by Kim Chuan Package.
KJDEP - might be replaced by Gali Batu Package.
SLBP - might be replaced by Tuas Package.
WLDEP/WPDEP - might be replaced by Mandai Package.
Gali Batu got plan for bus depot?
Hi anybody have pictures to show changi business park bus interchange complete construction? Cheers. Thanks.
Originally posted by TPS Timothy Mok:AMDEP - might be retained.
ARBP - might be replaced by Ulu Pandan Package.
BBDEP - might be retained.
BNDEP - might be replaced by Changi Package.
BRBP - might be retained.
CGBP - might be replaced by Changi Package.
HGDEP - might be replaced by Kim Chuan Package.
KJDEP - might be replaced by Gali Batu Package.
SLBP - might be replaced by Tuas Package.
WLDEP/WPDEP - might be replaced by Mandai Package.
From what i know there will be a Dairy Farm bus depot to replace Kjdep
Originally posted by carbikebus:From what i know there will be a Dairy Farm bus depot to replace Kjdep
That is news... Dairy Farm also to get depot... actually good location... close proximity from BPJ and CCK.
Originally posted by BusAnalayzer:That is news... Dairy Farm also to get depot... actually good location... close proximity from BPJ and CCK.
And quite near to CBD areas suchs as Marina,Shenton Way and New Bridge Rd.
Originally posted by Jasahchun:http://www.imageno.com/e3i1m8qkh5q5pic.html
hello guys, I think there will be a bus terminal at gali batu mrt depot
i think it will be most likely be a depot instead..
If there is a depot at Gali Batu, I doubt there will be another one at Dairy Farm.
Depots under construction:
1. Bulim (just completed)
2. Loyang
3. Sungei Seletar
4. Ullu Pandan
5. Changi (proposed)
6. Gali Batu (proposed)
7. Kim Chuan (proposed)
Still need more depots - I think good for now.
Looks like a place for a bus depot rather than a bus terminal...
Well, there are two posibility:
1) Bus Terminal:
- Which services are going to terminate there?
- Controlled by who? or is it a GPC again?
2) Bus Depot:
- For which company?
- How many lots (estimated)
* For point two, I have a feeling it is for SMRT instead of SBST. However, we wouldn't know...
If SMRT, the current bus services that are not under the package may be controlling here...
Svc 172, Svc 190 (Possible also there is a reshuffling of depot control within KJDEP and WLDEP)
If SBST, I would believe the depot will be accomodating for these services:
- Svc 160, Svc 161, Svc 168, Svc 170..
- May also test out Svc 138 perhaps as can have first bus start from Singapore Zoo or downroute along the routes.
Originally posted by SBS 9256 X:Looks like a place for a bus depot rather than a bus terminal...
Well, there are two posibility:
1) Bus Terminal:
- Which services are going to terminate there?
- Controlled by who? or is it a GPC again?2) Bus Depot:
- For which company?
- How many lots (estimated)* For point two, I have a feeling it is for SMRT instead of SBST. However, we wouldn't know...
If SMRT, the current bus services that are not under the package may be controlling here...
Svc 172, Svc 190 (Possible also there is a reshuffling of depot control within KJDEP and WLDEP)If SBST, I would believe the depot will be accomodating for these services:
- Svc 160, Svc 161, Svc 168, Svc 170..
- May also test out Svc 138 perhaps as can have first bus start from Singapore Zoo or downroute along the routes.
Ofcourse SMRT. Cannot be a depot just for 5 SBS services... for which also does not make sense. I have a feeling SMRT will continue to keep WDL/BPJ/CCK area... while Yishun/Sembawang might go to new operator under Sungei Seletar.
Originally posted by BusAnalayzer:Ofcourse SMRT. Cannot be a depot just for 5 SBS services... for which also does not make sense. I have a feeling SMRT will continue to keep WDL/BPJ/CCK area... while Yishun/Sembawang might go to new operator under Sungei Seletar.
it should be replacement for KJDEP.... due to complete in 2019... cant be building of stabiling yard for 39 DTL trains will take 4-5 years to complete? so most likely it is a depot instead... further the work suppose to commence in early 2015, but it was pushed back to End 2015... most likely due to additional of this bus depot...
Originally posted by BusAnalayzer:Depots under construction:
1. Bulim (just completed)
2. Loyang
3. Sungei Seletar
4. Ullu Pandan
5. Changi (proposed)
6. Gali Batu (proposed)
7. Kim Chuan (proposed)
Still need more depots - I think good for now.
plus mandai depot.... one more should be Bishan depot....
Originally posted by BusAnalayzer:If there is a depot at Gali Batu, I doubt there will be another one at Dairy Farm.
I thought Gali Batu is only bus terminal?
Originally posted by BusAnalayzer:If there is a depot at Gali Batu, I doubt there will be another one at Dairy Farm.
dairy farm is prime area for private housing.. dun think they will built depot there....
I see,Hmm SMB1614H kena ban SMB5052C takes over..What a crap!
SMb1614H not ban
Originally posted by SMB5052C:Stop creating threat when your EQ is so low.You always don’t a allow SMB1614H to create.
I didnt know high EQ post such annoying spammings furthermore reply own post..
Go back to IMH you retard!
Originally posted by lemon1974:i think it will be most likely be a depot instead..
"a new bus terminal that will provide a stopping point for buses terminating there" - copied from the news letter. I don't think a depot will provide a stopping point (except some services terminating at depots), nor do I think that LTA has messed up between bus terminals and bus depots.
Originally posted by array88:
"a new bus terminal that will provide a stopping point for buses terminating there" - copied from the news letter. I don't think a depot will provide a stopping point (except some services terminating at depots), nor do I think that LTA has messed up between bus terminals and bus depots.
Could be a bus terminal attached to a bus depot.
Originally posted by BusAnalayzer:Could be a bus terminal attached to a bus depot.
I find it strange to locate a bus terminal there.. I would rather the bus terminal to be at the open field Opp Kranji MRT Station. There can have Svc 170X, CW1 terminate there with proper queueing system...
Other services maybe possible is Svc 925C to Sungei Buloh Wetland Reserve...
Originally posted by SBS 9256 X:I find it strange to locate a bus terminal there.. I would rather the bus terminal to be at the open field Opp Kranji MRT Station. There can have Svc 170X, CW1 terminate there with proper queueing system...
Other services maybe possible is Svc 925C to Sungei Buloh Wetland Reserve...
Or maybe some BPJ services like 176 and 180 will be extended to Gali Batu? To save parking space in the upcoming BPJ ITH (I feel there will be a lack of parking lots); and also can serve some flats along Woodlands Rd.