Originally posted by iveco:Routes 9 and 35 are perfect but only one can be chosen.
Hi Mr iveco, bus service 60 could change to originate at Bedok Int, in exchange for a bus route at Bedok Int to re-route to Eunos Int. Cheers. Thanks.
Originally posted by SMB1368T:IMO if I can plan Bedok Int, I will keep the temp int and open the AC Int as well.
This is how it goes
AC Int
B1: 60/228/66
2: 38/229/87
3: 225G/225W/69
4: 14/222/26
5: 30e/30/7/401
Temp Int
B1: 32/33/16
2: 9/35/40
3: 168/854/155
4: 17/17A/18
5: 196/197
Hi Mr SMB1368T, Bedok Int has 58 lots. SBS svcs only need 2 lots each, as BNDEP's nearby. SMRT, TT & GA svcs need 3 lots each. Traffic would improve from 9 April. Cheers. Thanks.
From 9 April (next Sunday), there would be only be 27 routes at Bedok Bus Interchange - 1 of TT, 1 of GA, 1 of SMRT, 24 of SBS Transit.
SBS Transit would use a total of 48 parking lots.
SMRT, TT, GA would use a total of 9 parking lots.
Total = 57 parking lots would be used.
There would actually be 1 vacant lot, for bus service 30e to use during morning peak hours.
There would actually be an improvement in traffic flow at Bedok Bus Interchange.
Originally posted by iveco:Routes 9 and 35 are perfect but only one can be chosen.
9 is better - provides direct link for Simei and Tampines East residents to Eunos area. 35 better stay as it is, since most pax transfer to MRT.
But frankly speaking, both extensions are not likely to happen under LTA.
Originally posted by gekpohboy:Hi Mr SMB1368T, Bedok Int has 58 lots. SBS svcs only need 2 lots each, as BNDEP's nearby. SMRT, TT & GA svcs need 3 lots each. Traffic would improve from 9 April. Cheers. Thanks.
GA actually shouldn't need if they kept 17 as a loop service.
Originally posted by array88:9 is better - provides direct link for Simei and Tampines East residents to Eunos area. 35 better stay as it is, since most pax transfer to MRT.
But frankly speaking, both extensions are not likely to happen under LTA.
Yio Chu Kang Interchange will be expand in months to come..Tender will be closed on 31st May
Punggol NTWU canteen closed..Maybe shifted to other Concourse side or go for full renovation
Originally posted by carbikebus:Yio Chu Kang Interchange will be expand in months to come..Tender will be closed on 31st May
Originally posted by Sbs6750E:
To make space for 265/268. Also can extend sv 163M there with improved freq.
Extending 163M to YCK? I think unlikely. Well would 45 and 128 terminate at yck in the future too, since it is going to expand? And any insider info on how the layout would look like? Thanks.
Yio Chu Kang Interchange will be expand
Look like new bus service should be provide the area should be 71 and 44
Originally posted by carbikebus:Punggol NTWU canteen closed..Maybe shifted to other Concourse side or go for full renovation
Hi mr carbikebus, that place looks so old and dirty. It is finally time for full renovation. Meanwhile, bus captains can pop over to the nearby Ntuc food court at blk 273C Punggol field 150 metres away. Cheers. Thanks.
Originally posted by carbikebus:Yio Chu Kang Interchange will be expand in months to come..Tender will be closed on 31st May
Hi mr carbikebus, do you have the press release? Cheers. Thanks.
Originally posted by carbikebus:Yio Chu Kang Interchange will be expand in months to come..Tender will be closed on 31st May
Dear carbikebus, thanks for the inform. Hopefully, the upgrading would enhance the connection to the MRT station. Yours sincerely, gekpohboy
Originally posted by dupdup77:Hi mr carbikebus, do you have the press release? Cheers. Thanks.
Dear dupdup77, the information can be found at LTA website (https://www.lta.gov.sg/apps/tender/). Contract reference: RD320. Yours sincerely, gekpohboy
Originally posted by Vampire77lim:Yio Chu Kang Interchange will be expand
Look like new bus service should be provide the area should be 71 and 44
Dear Vampire77lim, the upgrading is probably for areas at Yio Chu Kang Rd, which will have many housing projects. Yours sincerely, gekpohboy
Originally posted by CZT:Extending 163M to YCK? I think unlikely. Well would 45 and 128 terminate at yck in the future too, since it is going to expand? And any insider info on how the layout would look like? Thanks.
Dear CZT, I do not know the layout, but I know the location would probably be at the reserve site along Avenue 6. Yours sincerely, gekpohboy
Originally posted by Sbs6750E:
To make space for 265/268. Also can extend sv 163M there with improved freq.
Dear Sbs6750E, the upgrade is for Yio Chu Kang Int only. With 8 services, but only 16 lots, more space is needed. Yours sincerely, gekpohboy
Originally posted by carbikebus:Yio Chu Kang Interchange will be expand in months to come..Tender will be closed on 31st May
I guess that there would be 8 lots for existing services (so each service would have 3 lots) and 6 lots for new services. Total 14 new lots.
speaking of this topic
the new shenton way bus terminal looks like ready about 80%
just left to install the fixtures at the building itself
Originally posted by azharjj:speaking of this topic
the new shenton way bus terminal looks like ready about 80%
just left to install the fixtures at the building itself
Dear azharjj, thanks for the update. From the looks of it, the new terminal should be ready around June this year. Yours sincerely, gekpohboy
Originally posted by gekpohboy:Dear dupdup77, the information can be found at LTA website (https://www.lta.gov.sg/apps/tender/). Contract reference: RD320. Yours sincerely, gekpohboy
Hi mr gekpohboy, I will appreciate if you don't reply to me. I don't want to talk to you. Cheers. Thanks.
Originally posted by CZT:Extending 163M to YCK? I think unlikely. Well would 45 and 128 terminate at yck in the future too, since it is going to expand? And any insider info on how the layout would look like? Thanks.
45 quite possible. 128 may remain with AMDEP as it is under Bishan contract.
Originally posted by azharjj:speaking of this topic
the new shenton way bus terminal looks like ready about 80%
just left to install the fixtures at the building itself
Ah...I entirely forgot about the new bus bays at the new Shenton Way Terminal.
Originally posted by Gus.chong:Ah...I entirely forgot about the new bus bays at the new Shenton Way Terminal.
Yahh shenton way and new bridge road i think we all forget liao. Azharjj did u happen to see how many berths the new ter has? And anyone with news regarding the relocation of new bridge road?