JIS, services 182, 192 and 193.Originally posted by cck_190:So, what bus services will be affected?
wah lau.. they got so many excuses already still not enough meh??? the almost got the LRT coming for NTU and jurong area. hahaOriginally posted by FireIce:then they have another excuse to raise price.........
Jurong Region Line will serve NTU. heard the line configuration has been revealed in 1 of the NTU newsletter. haven't u seen it?Originally posted by Parka:And it's about freaking time. Not that it's going to affect me because I'll be graduating from NTU by the time they finish with all the drilling and stuffs.
But they should serious extend the whole line to NTU.
On an average day, the average time I need is 45mins to 1 hour 10 mins to get from Bukit Gombak MRT to NTU
And it's [color]1 hour 20 minutes from Gombak to Changi MRT[/color]
What the hell.
Originally posted by boy20:As reported in the straits times,this line will be complete in two years
will be at least 4km long (Changi Airport Line is 6.5km long)
will have 2 stations.
i think there will be a station near yunnan gardens.Originally posted by wuming78:wich parts of jurong west?
Extension of the East-West Line may be completed in two years; it will improve public transport for those in Jurong WestIs it possible??? There are only 2 blocks in my precinct currently undergoes Main Upgrading Program. And they still schedule 2.5 years to complete.
must well make the MRT line to go to Jurong West Extension, Jurong Ind Est, Tuas and have LRT branching out from Jurong West Extension via NTU, SCDF, Jurong Bird Pk, Jurong Pier...Originally posted by kenmin:i think there will be a station near yunnan gardens.
Originally posted by kenmin:Jurong Region Line will serve NTU. heard the line configuration has been revealed in 1 of the NTU newsletter. haven't u seen it?
they haf to put it on my exam paper for me to read it...Originally posted by Parka:They have to paste that notice on the walls at the bus interchange at the place where I'm waiting for my bus for me to read it.
hahaha
I doubt it's the case for EWL extension. The yunnan gardens would probably be served by the Jurong Lines instead. And sorry to tell you, no news on when it would be built.Originally posted by kenmin:i think there will be a station near yunnan gardens.
¾�ËùÖª£¬¶«Î÷ÑÓ³¤�ß½«»á´ÓÎÄÀñÕ¾ÑÓÉìÈëÔ£Àȹ¤ÒµÇøÖ��ÄËùÔÚµÄԣȺ·(Joo Koon Road)¸½½ü
it's extended fr Boon Lay to Joo Koon. in between them would be Jurong West.Originally posted by iamgoondu:
I think it will make a left turn into Benoi Road. the station will along the road,Originally posted by tranquilice:In my guess, the extension will ply via Jurong West St 63, pass by the flats along Pioneer Rd North, then link up with Upp Jurong Rd to S'pore Discovery Centre, then make a left alignment into Joo Koon industrial area where the terminating point is, as mentioned in the press release.
Joo Koon? Which means Sv. 252 is prime candidate for withdrawal.Originally posted by kenmin:it's extended fr Boon Lay to Joo Koon. in between them would be Jurong West.
btw, I was not referring to NTU.
Don't think so. The extension will not probably follow service 252 route.Originally posted by SBS9818A:Joo Koon? Which means Sv. 252 is prime candidate for withdrawal.
No, since the extension goes to Joo Koon they will find excuses to remove Sv. 252, or make it loop at SLBP.Originally posted by tranquilice:Don't think so. The extension will not probably follow service 252 route.