the thread can be found here.
Got this from the NOTAMS
CONSTRUCTION OF NEW CHANGI EAST RUNWAY 01/19 LOCATED 1,800M EAST OF RUNWAY 02R/20L COMPLETED. OPERATIONAL TRIALS WILL BE CONDUCTED ON RUNWAY 01/19 BETWEEN 2330/0100 ON 5/6 TO 7/8, 9/10, 11/12 TO 13/14 APRIL. THE USE OF RUNWAY 01/19 IS SOLELY FOR THE REPUBLIC OF SINGAPORE AIRFORCE. 04 APR 09:32 UNTIL 14 APR 23:59
They should just open it up to WSSS. WSSS needs the expansion. Hmm, the runway is 9000 feet long?Originally posted by ^tamago^:thought tis might be of interest to some bus fans as well.
the thread can be found here.
CAAS's AIP (with diagrams & layouts) can be found here.
effective length of runway is 2,750m long.
heard there's no more go around right on 02R, must go left.
aerodrome fire & rescue svcs up to CAT 4.
the runway is built on reclaimed land & is exclusively for RSAF use only.
basically a new airport (new ICAO of its own) with its own apron and equipped with ILS.
Yah....WSSS desperately requires the third runway...especially with the few budget airlines trying to slug it out.Originally posted by SBS9818A:They should just open it up to WSSS. WSSS needs the expansion. Hmm, the runway is 9000 feet long?
Yeah. About just as long as 02/20.Originally posted by SBS9818A:Hmm, the runway is 9000 feet long?
Both 02L/20R and 02R/20L are 13023 ft long (4000m). Looks like Changi AB will reduce its dependency on 02L/20R.Originally posted by ^tamago^:Yeah. About just as long as 02/20.
Both 02L/20R and 02R/20L are 13023 ft long (4000m). Looks like Changi AB will reduce its dependency on 02L/20R.Originally posted by ^tamago^:Yeah. About just as long as 02/20.