strange considering CT8 and CT18 has good loads to sustain.. i was even hoping its freq be reduced to 20 mins, as in pre-CNY 2005, CT8 was 20 mins.. then i saw ppl waving at the bus madly after its scheduled time had been pulled down to 20mins later, means the pax probably waited 30 mins..