... ur comment is the worst ever i have seen in this entire thread...Originally posted by AVG:SHOULD HAVE DIED.... ITS KHARMA.... SOON WHOLE FAMILY WILL DIE.....
Its not that i wanna curse him but then, his flop in the money game will cause ppl their life also.... Family break up and wanna kill each other (internal info)
JAMES PHANG will burn in HELL!!!!!!!!!
Originally posted by abductboy:My counterpart has been there and was surprised that it is a very small piece of land... kinda like.. can build 2 houses but to build a 18 units-per floor (based on lowest floor) apartment block.......
Hmm.... my Malaysia guy first impression of the photos I sent is..
1) Not small land
2) It's close enough to the Central, so land is expensive
3) It is not easy to get that piece of land. How did they do it?







Hmm write to other newspapers?Originally posted by kyoshirou77:Well done, abductboy and friendsGood on ya ~
The land quite big mah......infact very big already.
Big enough for Magic Bob Kid Kingdom.
Can include all the well known project in it with the help of Mr.Bob the Builder.
Enough land to build in Magic Kingdom, NTI-Paris, Long Kang Water Theme park, Empire Floating Residential Tower with Babylon Garden and first Underground 5 Stars Sewage Linked Hotel.
Meet the contractors.
Back on topic,
From the land, still don't have Official Sign Board for Starting Date and Main contractor, this is even worst than the Malacca Theme Park Project.
Look at the Larang Grass.
Btw, anyone got updates on Malacca Project?
Shin Chew Daily ignored my 2 Emails, regarding the Malacca Pekan Klebang Land Ownership and Mr.Alex Lye HP.


We did our best liao, brother Redstone.Originally posted by redstone:Hmm write to other newspapers?
In Sg, you can pay a fee to run a check in the strata titles board and SLA, for the owner of the land. Wonder can we do the same over there?


The red dot in the small streetdirectory map points to front of the main road.Originally posted by kyoshirou77:
The is a road that cut across.....so it seem like it is the right place though.Nope... Definitely wrong location.
But the location sheet is missing in the compiled PDF files.
Making it harder to verify.

Oh btw, we are looking at a unconfirmed floor plan and no authority approval application submitted project.And yet amazingly at around 50% have been booked...
The above is based on SEM Statement @ Moneymakergroup.com
Reason : So EPV can still make changes to the design if desired.
ty for clarify.Originally posted by abductboy:Nope... Definitely wrong location.
The road cutting across is a small road, not the main road.
dat is in KL la, nt singapore.Originally posted by abductboy:The red dot in the small streetdirectory map points to front of the main road.
But the attached plan layout showed that it's at the back. funny yah..
Also, can someone inform Singapore Streetdirectory that their map has just been ripped without approval?![]()
btw, there is a compensation plan with cap if a project never take off.Originally posted by abductboy:Jalan Puan is the bigger road even lower down with the white stripes...
What we have here is a misinformation of facts on the location. Whether it is along Tun Razak or further inwards. The video, locations given are all conflicting.
Also only SE folks can buy. Not for outsiders.
There is a bitter taste here. They are selling a dream, and like all dreams, they change with each turn the body makes.
haha... Malaysia Streetdirectory is same owner as Singapore one.Originally posted by hiphop2009:dat is in KL la, nt singapore.

tat one already building..... shld be completed in few yrs time.Originally posted by mlmlover:very impressive!![]()
Why not check on SG IR too?LOL![]()
![]()
Why not u get it for us?Originally posted by mlmlover:![]()
so? go EPV to get the documents la. doubt and mislead ppl is ur aim? LOL . dun give me noble excuses again
![]()
![]()
Bet 100 bucks he cant get itOriginally posted by redstone:Why not u get it for us?Feel free to PM any of us
Hmm... Selling property without the approval?Originally posted by abductboy:And yet amazingly at around 50% have been booked...
The compensation plan don't mean anything.Originally posted by kyoshirou77:btw, there is a compensation plan with cap if a project never take off.
guess that why is limited to SE only, cause they are partners not buyers ~
*need to re-confirm this part*
