nope, both doors wont open. coz a wall will b built. refer to my top view layout posted on 30 September 2005 at 01:27 AM at http://mlrts.sgforums.com/?action=thread_display&thread_id=143614Originally posted by SGEMP:As I made my way north today morning, at Bishan stn exit towards the Juncti8n, there 's a informative board saying about the future of BIS stn.
It says:
There would be another entrance to the city-bound NSL platform, and thence another platform.
as this:
platform------city-bound track----------platform--------------WDL bound track
In this case when city-bound trains stop at Bishan, would doors on both sides be opened? Or one to avoid confusion???
As in both trains using same tracks(2 trains using 1 track) or the tracks crossover(one track above/below the other)?Originally posted by SGEMP:Well, is there some underground crossovers between EWL and NSL at the north end (towards City Hall) of Raffles Place MRT station?
i assure you one thing.Originally posted by 105090:May someone explain the track layout between Bugis/ Tanjong Pagar/ Raffles Place/ City Hall/ Dhoby Gaut/ Marina Bay??
The network looks so confusing
Two sets of three-car Electric Multiple Units (EMUs) which are permanently coupled, providing for driving cabs at either end of trains and four motorised cars in the middle.(This is for SMRT trains)Originally posted by 105090:where is the 4-carriage MRt train? still have anot?
and, how does the train carriages detach or attach themselves? have some magnet or?
Originally posted by 105090:but there's the cushion to rest on rite? Siemens train rite? it's been like that since late 90s nia.
why am i seeing SMRT trains with entire row of seats removed, in return for a empty and hollow cabin on some trains?
the older white model one.. not sure whats the name..Originally posted by sinicker:but there's the cushion to rest on rite? Siemens train rite? it's been like that since late 90s nia.
yes. another boring, no scenery line.Originally posted by Dead_Man_Inc:CCL will be full underground?
Looks like most lines in the future will be underground ones.Originally posted by sinicker:yes. another boring, no scenery line.
it's true. lesser air resistance i guess..Originally posted by alwaysdisturbed:i heard dat trains travel at a faster speed underground den on raised platforms...true?
i noticed whenever the train exits the tunnel after tiong bahru station n b4 redhill station, the brakes will b activated a couple of times, like intermitten brakin. but i can't really c if the speed changes bcoz i can't c hw fast it is travellin in the tunnel.
Negative.Originally posted by alwaysdisturbed:i heard dat trains travel at a faster speed underground den on raised platforms...true?
i noticed whenever the train exits the tunnel after tiong bahru station n b4 redhill station, the brakes will b activated a couple of times, like intermitten brakin. but i can't really c if the speed changes bcoz i can't c hw fast it is travellin in the tunnel.
Negative.Originally posted by sinicker:it's true. lesser air resistance i guess..
whyyyyy... really leh. enter tunnel aft bedok, speed up. come out, slow down. enter tunnel aft kallang, speed up, come out aft tiong bahru, slow down..Originally posted by Manager433:Negative.