Juz curious.
Are there any annoucement in the station for BPLRT last train or DNB train.
That's say that there is a LTE train serving a line. When LTE service has ended, where does the train go?
What is the purpose of having a time limit on travel time?
Originally posted by Kawasaki C751B:That's say that there is a LTE train serving a line. When LTE service has ended, where does the train go?
The train went back to depot, this should be know...
How does the Changi Airport station' track looks like? Simliar with Joo Koon and Pasir Ris? If different anyone draw a diagram?
Originally posted by Kawasaki C751B:That's say that there is a LTE train serving a line. When LTE service has ended, where does the train go?
For EWL , TRN 201-203 goes back to CHD and TRN 204-206 goes back to UPD
For NSL , all LTE trains goes back to BSD.
Originally posted by BiminiRosy:How does the Changi Airport station' track looks like? Simliar with Joo Koon and Pasir Ris? If different anyone draw a diagram?
What do you mean by track? Station layout , same as other stations , island platform. For crossover , it is a scissors crossover , it looks like a "X" shape.
Originally posted by Bus and Train LoVuR:What do you mean by track? Station layout , same as other stations , island platform.
he probably means the junction when leaving the station
from what i remember, it is a scissors crossover
Originally posted by jayh272416:he probably means the junction when leaving the station
from what i remember, it is a scissors crossover
OK. I told him already.
Originally posted by jayh272416:he probably means the junction when leaving the station
from what i remember, it is a scissors crossover
ya, but anyway I'm a Chinese.. I felt strange about train arriving Changi Airport....
Originally posted by Scania96:Juz curious.
Are there any annoucement in the station for BPLRT last train or DNB train.
Yes there is, when a DNB train arrives, the RATIS will show "XX DO NOT BOARD" and there will be an announcement in all 4 languages. I forgotten how it sounds though. This happens most of the time for coupled trains when they are going back to the depot to uncouple.
For last train, I don't know.
Originally posted by jerryonhere:Yes there is, when a DNB train arrives, the RATIS will show "XX DO NOT BOARD" and there will be an announcement in all 4 languages. I forgotten how it sounds though. This happens most of the time for coupled trains when they are going back to the depot to uncouple.
For last train, I don't know.
http://www.youtube.com/watch?v=W9zduVMoSqU
Weird that they play in the train. The announcement is a STATION announcement.
I heard before special last train announcements on days like Christmas eve when there is extension in op hours. Usually the announcements are made by the station managers themselves.
Thanks for the info. But does NEL have DNB train and does it have annoucement and does what isSengkang LRT, Punggol LRT DNB/Last Train Annoucement. Thanks in advance.
How big is the train wheel? (Height , for C151)
Does C151 , C651 and C751B use the same wheel?
Originally posted by Bus and Train LoVuR:How big is the train wheel? (Height , for C151)
Does C151 , C651 and C751B use the same wheel?
U mean the diameter? It is mentioned somewhere in this thead before i think.
Originally posted by wenjie639:http://www.youtube.com/watch?v=W9zduVMoSqU
Weird that they play in the train. The announcement is a STATION announcement.
Actually, it's different...What I heard was (not accurate), "The next train is not for boarding."
Originally posted by wenjie639:U mean the diameter? It is mentioned somewhere in this thead before i think.
the wheels are 850mm in diameter when new.
Originally posted by Interception_7:the wheels are 850mm in diameter when new.
Thanks!
Originally posted by jerryonhere:Actually, it's different...What I heard was (not accurate), "The next train is not for boarding."
For BPLRT's DoNotBoard Trains:
Passenger info panel will be e.g.
XX DO NOT BOARD
SERVICE A VIA SENJA 3 MIN
Announcement:
The [next] train on platform X is out of service. please do not board.
The [next] is in brackets as I am not sure if this word is in the announcement...
To youyuan:
The train is in CM mode while it is raining. The light indicates that the train is in CM mode.
Originally posted by Kawasaki C751B:To youyuan:
The train is in CM mode while it is raining. The light indicates that the train is in CM mode.
Originally posted by youyuan:
what does it mean by "CM"
CM= Coded Manual.
Originally posted by joeyfjj:
For BPLRT's DoNotBoard Trains:Passenger info panel will be e.g.
XX DO NOT BOARD
SERVICE A VIA SENJA 3 MINAnnouncement:
The [next] train on platform X is out of service. please do not board.The [next] is in brackets as I am not sure if this word is in the announcement...
Yes the next is in the announcement.