hmm. this topic looks like it's dragged into the past. Well it's not over.
Lets guess when the next batch of HHPSD will be installed at Jurong East new platform? hmm... i guess .. January of Feburary ....
Originally posted by i_luv_erky:hmm. this topic looks like it's dragged into the past. Well it's not over.
Lets guess when the next batch of HHPSD will be installed at Jurong East new platform? hmm... i guess .. January of Feburary ....
The whole platform on the left of EB train to Pasir Ris fully revealed after they removed the green tall hoardings
wondering whats the name of the platform
| E F | A C| D B| ?
Originally posted by azharjj:The whole platform on the left of EB train to Pasir Ris fully revealed after they removed the green tall hoardings
wondering whats the name of the platform
| E F | A C| D B| ?
Should be Platform [__|EF|__|AC|__|DB|__]
i think so
Originally posted by i_luv_erky:Should be Platform [__|EF|__|AC|__|DB|__]
i think so
Maybe changed to [__|AB|__|CD|__|EF|__]
Originally posted by azharjj:The whole platform on the left of EB train to Pasir Ris fully revealed after they removed the green tall hoardings
wondering whats the name of the platform
| E F | A C| D B| ?
I think they will make some changes to the lettering once the new platform goes into operation.
Originally posted by jcqh:I think they will make some changes to the lettering once the new platform goes into operation.
Well Definitely, They would have to record new announcement as well. Like "The Train at Platform E terminates it service at Yishun" For Example
New platforms

Bump! Anyway, PLEASE DO NOT LOCK THIS TOPIC UNTIL FEBRUARY 2011 OR THE OFFICIAL OPENING DATE!
New NS platform PSD up but PSD along EB side still under construction
Originally posted by brotherchen1982:New NS platform PSD up but PSD along EB side still under construction
since a week ago
i post that at the other topic
1=========================================================(new)
2=========================================================(
3=========================================================old
4========================================================= )
Section 1 to 2 is the new platform. Now that LTA know that there can't be only one middle track, Section 1 to 2 won't be built. Instead Number 3 would have 2 tracks.
Eh! Won't there be a glass roof? or has things changed? Cause the metal bars are now red.
Originally posted by kenn3th:Eh! Won't there be a glass roof? or has things changed? Cause the metal bars are now red.
the design of the new platform is following the design of the current station. so as to look more standardised rather than odd.

JEMP updates. Minister visited the station yesterday
to their flickr album to see http://www.flickr.com/photos/motsg/5473069255/in/set-72157626126931740/
hmm
that means the new platform arrangement will be
|A B|C D|E F|
where | is the track
signboards such as "NS1 Jurong East" & "5 to Marina Bay via woodlands" have installed at the new platform