MRT East West Line Tuas West Extension
- 3 Elevated Island Platform Stations
- 1 Elevated 2 Island 4 Track Platform Interchange Station (Interchange With Future 6km 2 Station Tuas South Extension)
- 7.5km
- 1 Depot At Tuas Checkpoint
- Completion 2nd Quarter 2015
BLE open just 3 mths, new extension from BLE tender come liao... so fast.
Tuas Extension will be a fully elevated viaduct line?
an elevated city hall/raffles place styled interchange station?
a further SIX km, TWO station extension? I guess the tuas south section became an even further future extension. oh well.
Originally posted by ignoramuses:MRT East West Line Tuas West Extension
- 3 Elevated Island Platform Stations
- 1 Elevated 2 Island 4 Track Platform Interchange Station (Interchange With Future 6km 2 Station Tuas South Extension)
- 7.5km
- 1 Depot At Tuas Checkpoint
- Completion 2nd Quarter 2015
The link can't be opened. More summary below:
- Fully Elevated line
- 13.5 km long with 2 legs: Tuas West Extension and Tuas South Extension
- Total 6 stations and a depot
- West Extension is 7.5 km long with 3 stations plus one interchange station with South Extension.
- South Extension is 6 km long with 2 stations, to construct at a future date.
Schematic Track Alignment: http://i15.photobucket.com/albums/a371/tranquilice/TuasExtension.jpg
finally
Originally posted by tranquilice:
The link can't be opened. More summary below:- Fully Elevated line
- 13.5 km long with 2 legs: Tuas West Extension and Tuas South Extension
- Total 6 stations and a depot
- West Extension is 7.5 km long with 3 stations plus one interchange station with South Extension.
- South Extension is 6 km long with 2 stations, to construct at a future date.
Schematic Track Alignment: http://i15.photobucket.com/albums/a371/tranquilice/TuasExtension.jpg
Another branch line. 0.o
Wonder if they will ever run from Changi Airport to Tuas South Extension direct.
New Contract 1660 - Architectural & Consultancy Services For Tuas West Depot
Tuas Depot
- 60 trains capacity
- Implemented in 2 phases.
Hmm..
6km Long extention: EW 30, EW 31,EW 32, EW 33.
1 Additional Depot for EWL
EW 30 (Station A0) - With additional track in center
EW 33 (Station A3) - X shaped crossover (like CGA)
Depot after EW 33.
is Station A3 will proposed link to Tuas Checkpoint?
whoa
joo koon not enough, now they want to create more ghost stations?
Schematic diagram for NSL extension: http://s15.photobucket.com/albums/a371/tranquilice/NSLe_schematic.jpg