Installation of half-height PSDs in above-ground MRT stations
Total of 54 sets for stns with 2 platforms, and 108 sets for stns with 4 platforms
Installed and Working:
1. PSR - 54 (LIVE as of 01/11/09)
2. YIS - 54 (LIVE as of 02/12/09)
3. JUR - 108 (LIVE as of 18/12/09)
Installing PSDs (3rd Stage)
-
Black-Yellow Panel (2nd Stage)
1. Clementi
2. Chinese Garden
3. Bukit Batok
4. Bukit Gombak
5. Lakeside
Red Markings (1st Stage)
1. Boon Lay
2.Buona Vista
3. Joo Koon
4. Pioneer
5. Tanah Merah
Updates:
23/02/10: Pioneer & Tanah Merah added on 1st stage
12/02/10: Lakeside moved frm 1st stage to 2nd stage
09/02/10: Bukit Gombak moved from 1st stage to 2nd stage
06/02/10: Bukit Batok moved from 1st stage to 2nd stage
Joo Koon & Bukit Gombak added on 1st stage
31/01/10: Admiralty removed from 2nd stage
30/01/10: Chinese Garden moved from 1st stage to 2nd stage
Admiralty added on 2nd stage
---------------------------------------------------------------------------------------------------------------
Guessing Which Station In The Eastern will Get HHPSD first?
(Do Not Include PSR) 3 Guesses per person
(Closing Date : OVER )
Khairiano - Tanah Merah, Expo & Tampines
Bus and Train LoVuR - Kallang & Paya Lebar
LTnF1fan - Tampines, Bedok & Kallang
BiminiRosy - Tampines, Tanah Merah & Paya Lebar
smrt3099 - Expo, Bedok & Eunos
Scania96 - Bedok, Paya Lebar & Tampines
TIB770T - Eunos,Tanah Merah &Tampines
Samuel Lee - Tampines, Bedok & Paya Lebar
Chanzelun1996 - Eunos, Tampines & Kallang
Kawasaki C751B - Tanah Merah, Paya Lebar & Bedok
jayh272416 - Bedok, Tampines & Paya Lebar
SBS n SMRT - bedok, tanah merah & paya lebar
Bukit Batok have black-yellow panels on SB , whole platform.
Chinese Garden have black-yellow panels on both panels.
Red markings as in arrows pointing forward toward the trains with words below? I saw them at Joo Koon, and Bukit Batok...
Bukit Gombak got markings on both platforms
i join contest:
east - bedok, tanah merah and paya lebar
Bukit Gombak has the black-yellow panel on the whole SB platform.
Originally posted by Bus and Train LoVuR:Bukit Gombak has the black-yellow panel on the whole SB platform.
so cool, havent been travelling on western part of NSL and got a fast progress
Bukit gombak have black yellow panels both platform today
Lakeside got 4 yellow black panes today
Lakeside now has the black-yellow panels along the entire eastbound platform. Shouldn't be long till upward construction of the doors begins! :D
other than Joo Koon, Pioneer has had the red markings for quite a while, but it seems nobody noticed so I thought I should let you all know..
adding my guess too, Expo
Originally posted by smrt3099:adding my guess too, Expo
Was @ Expo two hours ago.
It seems that Expo would be the last station imho to get PSDs though...
Originally posted by Fryderyk HPH:Was @ Expo two hours ago.
It seems that Expo would be the last station imho to get PSDs though...
will update
Dover is in Stage One. I'll try and get a pic tomorrow.
dover mrt hav those red markings.
I saw some red markings at Tanah Merah, but I can't confirm that's the HHPSDs, as it had an arrow pointing to the tracks/train doors.
Originally posted by yellowflip999:I saw some red markings at Tanah Merah, but I can't confirm that's the HHPSDs, as it had an arrow pointing to the tracks/train doors.
Most likely TNM have red markings.
Originally posted by Bus and Train LoVuR:Most likely TNM have red markings.
That's good! Finally TNM get red markings.
Here's the red arrow I'm talking about.

And it seems to me that D24 means Door 24. (This was taken at Tanah Merah middle platform by the way)
Originally posted by yellowflip999:Here's the red arrow I'm talking about.
And it seems to me that D24 means Door 24. (This was taken at Tanah Merah middle platform by the way)
That's for the PSD. There are D1 - D24 (Door 1 to Door 24)
Originally posted by Khairiano:Guessing Which Station In The Eastern will Get HHPSD first?
(Do Not Include PSR) 3 Guesses per person
(Closing Date : 10 Feb 2010 )
Khairiano - Tanah Merah, Expo & Tampines
Bus and Train LoVuR - Kallang & Paya Lebar
LTnF1fan - Tampines, Bedok & Kallang
BiminiRosy - Tampines, Tanah Merah & Paya Lebar
smrt3099 - Expo, Bedok & Eunos
Scania96 - Bedok, Paya Lebar & Tampines
TIB770T - Eunos,Tanah Merah &Tampines
Samuel Lee - Tampines, Bedok & Paya Lebar
Chanzelun1996 - Eunos, Tampines & Kallang
Kawasaki C751B - Tanah Merah, Paya Lebar & Bedok
jayh272416 - Bedok, Tampines & Paya Lebar
SBS n SMRT - bedok, tanah merah & paya lebar
Closing date over already , please change to "Closing date is over , no guesses will be entertained".
Lakeside now has black-yellow panels along both platforms.
Originally posted by mrtdude5:Lakeside now has black-yellow panels along both platforms.
Reported weeks ago
Originally posted by wenjie639:Reported weeks ago
Uh, the westbound platform only got its panels recently... I'm just trying to help, you know.