Originally posted by c751bLoVuR:They can install during the night time after the last train...
vry slow...take years
Originally posted by Bus and Train LoVuR:UPDATE : BGB NB has 20 sets of PSD.
oh
i tot i count 18
Installation of half-height PSDs in above-ground MRT stations
Total of 54 sets for stns with 2 platforms, and 108 sets for stns with 4 platforms
Installed and Working:
1. PSR - 54 (LIVE as of 01/11/09)
2. YIS - 54 (LIVE as of 02/12/09)
3. JUR - 108 (LIVE as of 18/12/09)
Installing PSDs (3rd Stage)
01. Clementi (Eb - 23 + Wb - 23 = 46 --- 27/04/10)
02. Bukit Gombak (Nb - 20 --- 08/05/10)
Black-Yellow Panel (2nd Stage)
01.Lakeside
02.Chinese Garden
03.Bukit Batok
Red Markings (1st Stage)
01.Joo Koon
02.Pioneer
03.Boon Lay
04.Dover
05.Buona Vista
06.Commonwelth
07.Queenstown
08.Redhill
09. Kallang
10. Aljunied
11. Paya Lebar
12. Eunos
13. Kembangan
14. Bedok
15. Tanah Merah
16. Simei
17.Tampines
18. Choa Chu Kang
19. Yew Tee
20. Kranji
21. Marsiling
22. Woodlands
23. Khatib
24. Yio Chu Kang
25. Ang Mo Kio
Updates:
02/05/10: Kranji, Marsiling and Woodlands added on 1st stage
01/05/10: Bukit Gombak moved from 2nd stage to 3rd stage
14/04/10: Khatib added on 1st Stage
28/03/10: Clementi moved from 2nd Stage to 3rd Stage
21/03/10: Yew Tee added on 1st stage
15/03/10: Ang Mo Kio added on 1st stage
14/03/10: Yio Chu Kang added on 1st Stage
13/03/10: Kallang, Aljunied, Paya Lebar, Eunos, Bedok, Kembangan and Simei
added on 1st stage
04/03/10: Choa Chu Kang added on 1st stage
26/02/10: Tampines, Dover, Commonwelth, Queenstown, Buona Vista & Rehill
added on 1st stage
23/02/10: Pioneer & Tanah Merah added on 1st stage
12/02/10: Lakeside moved frm 1st stage to 2nd stage
09/02/10: Bukit Gombak moved from 1st stage to 2nd stage
06/02/10: Bukit Batok moved from 1st stage to 2nd stage
Joo Koon & Bukit Gombak added on 1st stage
31/01/10: Admiralty removed from 2nd stage
30/01/10: Chinese Garden moved from 1st stage to 2nd stage
Admiralty added on 2nd stage
---------------------------------------------------------------------------------------------------------------
Guessing Which Station In The East will Get HHPSD first?
(Do Not Include PSR) Up to 3 Guesses per person
(Closing Date : OVER )
Khairiano - Tanah Merah, Expo & Tampines
Bus and Train LoVuR - Kallang & Paya Lebar
LTnF1fan - Tampines, Bedok & Kallang
BiminiRosy - Tampines, Tanah Merah & Paya Lebar
smrt3099 - Expo, Bedok & Eunos
Scania96 - Bedok, Paya Lebar & Tampines
TIB770T - Eunos,Tanah Merah &Tampines
Samuel Lee - Tampines, Bedok & Paya Lebar
Chanzelun1996 - Eunos, Tampines & Kallang
Kawasaki C751B - Tanah Merah, Paya Lebar & Bedok
jayh272416 - Bedok, Tampines & Paya Lebar
SBS n SMRT - bedok, tanah merah & paya lebar
-------------------------------------------------------------------------------------------------------------
I was wondering, would they prioritise Bedok to build PSDs first since that incident happened.
Originally posted by SBS7322B:I was wondering, would they prioritise Bedok to build PSDs first since that incident happened.
I don't think so, because they said install on the West part area first then following to East then North.
Originally posted by SBS7322B:I was wondering, would they prioritise Bedok to build PSDs first since that incident happened.
no it will not happen. it will be like oh this station people jump than they build first. so selfish people will do it. the mindset is "after that sure got PSD" at this station.
Originally posted by azharjj:
ohi tot i count 18
I did not count it carefully , maybe yours is correct.
PSDs installation at Clementi almost completed.
Originally posted by Kawac151:PSDs installation at Clementi almost completed.
left the front and back two platforms... :( No news.....
Prioritize TNM and BNL too.. Super crowded
erm
Chinese Garden (EW25)
and
Lakeside (EW26)
having HHPSD?
in 3rd stage?
i think now SB platform @ Bukit Gombak got PSDs installed already.
Originally posted by d143b2:erm
Chinese Garden (EW25)
and
Lakeside (EW26)
having HHPSD?
in 3rd stage?
Installation of PSD not started yet.
Originally posted by Bus and Train LoVuR:Installation of PSD not started yet.
okay
then the clementi stations no updates?
What do you mean by Black-Yellow panel?
Originally posted by Call4ljw:What do you mean by Black-Yellow panel?
Please refer to the first page.
Originally posted by d143b2:okay
then the clementi stations no updates?
Yup , as of today.
PSD Pasir ris got problem. when the train arrived, train doors open but PSD open and close many times. lol. maybe it just a small fault or something wrong with that door.
In CLE, any PSD added at the front or back of the platform??
Originally posted by smrt3099:In CLE, any PSD added at the front or back of the platform??
nope... still none
bukit batok may get it soon
Originally posted by d143b2:bukit batok may get it soon
Any source(s)?
Originally posted by youyuan:PSD Pasir ris got problem. when the train arrived, train doors open but PSD open and close many times. lol. maybe it just a small fault or something wrong with that door.
Sometimes JUR's PSD have that problem.
Originally posted by youyuan:PSD Pasir ris got problem. when the train arrived, train doors open but PSD open and close many times. lol. maybe it just a small fault or something wrong with that door.
That happened ytd when I alighted.
Originally posted by Bus and Train LoVuR:Any source(s)?
just a guess