psd installation is very slow even there is another death at sembawang mrt station today which got one hour delay.
How to convince LTA to install PSD faster so can speed up work? i guess all psd at open station will be completed by 2015. even installation is very slow and slow....
Even promised by LTA to have it completed by 2012,i sure they cant make it due to the rising cost of the items.
Do you think about it?
Originally posted by slwsglz:psd installation is very slow even there is another death at sembawang mrt station today which got one hour delay.
How to convince LTA to install PSD faster so can speed up work? i guess all psd at open station will be completed by 2015. even installation is very slow and slow....
Even promised by LTA to have it completed by 2012,i sure they cant make it due to the rising cost of the items.
Do you think about it?
Sign contract liao you think they still waste time buy? They delivering liao...
The end doors have been installed at Clementi, now just waiting for the door that seperates the platform and the "driver's area", where the cab door will stop at.
Originally posted by slwsglz:psd installation is very slow even there is another death at sembawang mrt station today which got one hour delay.
How to convince LTA to install PSD faster so can speed up work? i guess all psd at open station will be completed by 2015. even installation is very slow and slow....
Even promised by LTA to have it completed by 2012,i sure they cant make it due to the rising cost of the items.
Do you think about it?
If you think it is so easy to install PSDs and also continue operations of the station, I suggest you should be the manager of the project instead. Please, THINK BEFORE YOU EVEN POST.
Originally posted by SBS7322B:If you think it is so easy to install PSDs and also continue operations of the station, I suggest you should be the manager of the project instead. Please, THINK BEFORE YOU EVEN POST.
Later sekali I walking past then got one guy carrying the HHPSD, then I accidentally knock into that guy.
$$$ fly.
Originally posted by mrtdude5:The end doors have been installed at Clementi, now just waiting for the door that seperates the platform and the "driver's area", where the cab door will stop at.
ya... 4x 40% doors installed
admiralty station: HW-SB i think there is a D01 sticker on the platform
Installation of half-height PSDs in above-ground MRT stations
Total of 54 sets for stns with 2 platforms, and 108 sets for stns with 4 platforms
Installed and Working:
1. PSR - 54 (LIVE as of 01/11/09)
2. YIS - 54 (LIVE as of 02/12/09)
3. JUR - 108 (LIVE as of 18/12/09)
Installing PSDs (3rd Stage)
01. Clementi (EB - 25 + WB - 25 = 50 --- 01/06/10)
02. Bukit Gombak (NB - 25 + SB 25 = 50 --- 04/06/10)
Black-Yellow Panel (2nd Stage)
01.Lakeside
02.Chinese Garden
03.Bukit Batok
Red Markings (1st Stage)
01.Joo Koon
02.Pioneer
03.Boon Lay
04.Dover
05.Buona Vista
06.Commonwelth
07.Queenstown
08.Redhill
09. Kallang
10. Aljunied
11. Paya Lebar
12. Eunos
13. Kembangan
14. Bedok
15. Tanah Merah
16. Simei
17.Tampines
18. Choa Chu Kang
19. Yew Tee
20. Kranji
21. Marsiling
22. Woodlands
23. Khatib
24. Yio Chu Kang
25. Ang Mo Kio
Updates:
02/05/10: Kranji, Marsiling and Woodlands added on 1st stage
01/05/10: Bukit Gombak moved from 2nd stage to 3rd stage
14/04/10: Khatib added on 1st Stage
28/03/10: Clementi moved from 2nd Stage to 3rd Stage
21/03/10: Yew Tee added on 1st stage
15/03/10: Ang Mo Kio added on 1st stage
14/03/10: Yio Chu Kang added on 1st Stage
13/03/10: Kallang, Aljunied, Paya Lebar, Eunos, Bedok, Kembangan and Simei
added on 1st stage
04/03/10: Choa Chu Kang added on 1st stage
26/02/10: Tampines, Dover, Commonwelth, Queenstown, Buona Vista & Rehill
added on 1st stage
23/02/10: Pioneer & Tanah Merah added on 1st stage
12/02/10: Lakeside moved frm 1st stage to 2nd stage
09/02/10: Bukit Gombak moved from 1st stage to 2nd stage
06/02/10: Bukit Batok moved from 1st stage to 2nd stage
Joo Koon & Bukit Gombak added on 1st stage
31/01/10: Admiralty removed from 2nd stage
30/01/10: Chinese Garden moved from 1st stage to 2nd stage
Admiralty added on 2nd stage
---------------------------------------------------------------------------------------------------------------
Guessing Which Station In The East will Get HHPSD first?
(Do Not Include PSR) Up to 3 Guesses per person
(Closing Date : OVER )
Khairiano - Tanah Merah, Expo & Tampines
Bus and Train LoVuR - Kallang & Paya Lebar
LTnF1fan - Tampines, Bedok & Kallang
BiminiRosy - Tampines, Tanah Merah & Paya Lebar
smrt3099 - Expo, Bedok & Eunos
Scania96 - Bedok, Paya Lebar & Tampines
TIB770T - Eunos,Tanah Merah &Tampines
Samuel Lee - Tampines, Bedok & Paya Lebar
Chanzelun1996 - Eunos, Tampines & Kallang
Kawasaki C751B - Tanah Merah, Paya Lebar & Bedok
jayh272416 - Bedok, Tampines & Paya Lebar
SBS n SMRT - bedok, tanah merah & paya lebar
---------------------------------------------------------------------------------------------------------
So...any updates?
Originally posted by SMRT/SBS Transit:So...any updates?
LOL, you have posted many threads about this... :)
UPDATE : CLE EB and WB have 25 sets of PSD each (23 + 2 small PSDs on the ends) . BGB NB has 25 sets of PSD and SB has 24 sets of PSD.
Sigh still progressing very slow
At least they are installing the 40:60 doors already.YAY!100thPost!!!![]()
UPDATE : BGB SB has 25 sets of PSD.
Wah Sian. Hope Redhill faster install PSD!
Originally posted by SBS9231S:Wah Sian. Hope Redhill faster install PSD!
For me: Chinese Garden and Bukit Batok.
Originally posted by c751bLoVuR:For me: Chinese Garden and Bukit Batok.
hahas. Redhill i always hear TO press Horn Dune why. Got one time i stand Very Near Yellow Line den the TO press Horn i Chua tio suddenly Jump. Almost Fall Leh!
Originally posted by SBS9231S:hahas. Redhill i always hear TO press Horn Dune why. Got one time i stand Very Near Yellow Line den the TO press Horn i Chua tio suddenly Jump. Almost Fall Leh!
LOL why you stand AFTER the yellow line??
TO horn you??
Originally posted by c751bLoVuR:LOL why you stand AFTER the yellow line??
TO horn you??
No i stand before the Yellow Line but Very Near x.X i think he horn bcos got kids running at Platform when i turn right and see lol. Still got one time TO use E-Brake
Originally posted by SBS9231S:No i stand before the Yellow Line but Very Near x.X i think he horn bcos got kids running at Platform when i turn right and see lol. Still got one time TO use E-Brake
Redhill - Dangerous, Maybe until 2012 all the TOs, apply EMG Brake, open cabin door, use some loudspeaker shout "OI!!! DONT RUN LEH!!!!" Switch to Coded manual, accelerate till 15km/h only
Originally posted by Dragonaxe:Redhill - Dangerous, Maybe until 2012 all the TOs, apply EMG Brake, open cabin door, use some loudspeaker shout "OI!!! DONT RUN LEH!!!!" Switch to Coded manual, accelerate till 15km/h only
lol u mean RM mode?
Originally posted by SBS9231S:lol u mean RM mode?
Lol yeah.
Still remember that guy who fainted on the tracks? Wa he uber lucky, lucky right because when the train exit from the tunnel dunno gt what psychics involved make it go faster. From there onwards, it decelerate like siao.
Originally posted by Dragonaxe:Lol yeah.
Still remember that guy who fainted on the tracks? Wa he uber lucky, lucky right because when the train exit from the tunnel dunno gt what psychics involved make it go faster. From there onwards, it decelerate like siao.
Huh u mean Decelerate = go faster?
Originally posted by SBS9231S:Huh u mean Decelerate = go faster?
after it exit the tunnel, it will somehow go faster, once it is completely out, it decelerate
Originally posted by Dragonaxe:after it exit the tunnel, it will somehow go faster, once it is completely out, it decelerate
Yea i know. so used to taking there liao. But got a few times Chiong Sua Mode, Chiong Like No Station Business.
i Still rmb got one time. When Enter lavender still fine weather. when suddenly Out of Tunnel at Redhill THUNDERSTORM the Train still Full Speed Leh! Wah i tink the TO chua Tio Suddenly Brake damn hard.