Installation of
half-height PSDs in above-ground MRT
stations
Total of 27 sets per
platform
Installed and
Working:
1. PSR
-
54 (LIVE as of
01/11/09)
2. YIS
- 54 (LIVE as
of 02/12/09)
3. JUR
- 108 (LIVE as
of 18/12/09)
Installing PSDs (3rd Stage)
01.
Clementi (EB
- 25 + WB
- 25 = 50 --- 01/06/10)
02. Bukit Gombak (NB - 25 +
SB 25 = 50 ---
04/06/10)
03. Lakeside
(EB
- 23 + WB - 23 = 46 --- 18/06/10)
04. Bukit Batok (NB - 2 + SB
- 19 = 21 ---
02/07/10)
Black-Yellow Panel (2nd
Stage)
01. Chinese Garden
Red Markings
(1st Stage)
01. Joo Koon
02. Pioneer
03. Boon Lay
04. Dover
05. Buona Vista
06. Commonwelth
07. Queenstown
08. Redhill
09. Kallang
10. Aljunied
11. Paya Lebar
12. Eunos
13. Kembangan
14. Bedok
15. Tanah Merah
16. Simei
17. Tampines
18. Choa Chu Kang
19. Yew Tee
20. Kranji
21. Marsiling
22. Woodlands
23. Khatib
24. Yio Chu Kang
25. Ang Mo Kio
Updates:
24/06/10
: Bukit Batok moved from 2nd stage to 3rd stage
08/06/10: Lakeside moved from 2nd
stage to
3rd stage
02/05/10: Kranji, Marsiling and Woodlands added
on 1st stage
01/05/10: Bukit Gombak moved from 2nd stage to
3rd stage
14/04/10: Khatib added on 1st Stage
28/03/10: Clementi moved from 2nd Stage to 3rd
Stage
21/03/10: Yew Tee added on 1st stage
15/03/10: Ang Mo
Kio added on 1st stage
14/03/10: Yio Chu Kang added on 1st Stage
13/03/10: Kallang, Aljunied, Paya Lebar, Eunos,
Bedok,
Kembangan and Simei
added on 1st stage
04/03/10: Choa Chu Kang added on 1st stage
26/02/10: Tampines, Dover, Commonwelth,
Queenstown, Buona Vista
& Rehill
added
on 1st stage
23/02/10:
Pioneer & Tanah Merah added on 1st stage
12/02/10: Lakeside
moved frm 1st stage to 2nd stage
09/02/10:
Bukit Gombak moved from 1st stage to 2nd stage
06/02/10: Bukit Batok
moved from 1st stage to 2nd stage
Joo
Koon & Bukit Gombak added on 1st stage
31/01/10:
Admiralty removed from 2nd stage
30/01/10: Chinese Garden moved from 1st stage to
2nd stage
Admiralty
added on 2nd stage
---------------------------------------------------------------------------------------------------------------
Guessing Which
Station In The East will Get HHPSD first?
(Do Not Include PSR) Up
to 3
Guesses per person
(Closing
Date : OVER )
Khairiano -
Tanah Merah, Expo & Tampines
Bus and
Train
LoVuR - Kallang &
Paya
Lebar
LTnF1fan -
Tampines, Bedok & Kallang
BiminiRosy - Tampines,
Tanah Merah & Paya Lebar
smrt3099 - Expo, Bedok &
Eunos
Scania96 - Bedok,
Paya Lebar & Tampines
TIB770T -
Eunos,Tanah Merah &Tampines
Samuel
Lee - Tampines, Bedok
& Paya Lebar
Chanzelun1996 - Eunos,
Tampines & Kallang
Kawasaki C751B - Tanah Merah,
Paya Lebar
& Bedok
jayh272416 - Bedok,
Tampines & Paya Lebar
SBS n SMRT -
bedok, tanah merah & paya lebar
---------------------------------------------------------------------------------------------------------
Gussing which of these 2 stations will be the
later to have HHPSDs
installed
a) Chinese Garden
b) Bukit Batok
Ans : A) Chinese Garden (People in red gets the
correct
answer)
Khairiano: b
Scania96: a
yellowflip999: a
c751bLoVuR : a
Kawac151: a
alstom metropolis: a
Dragonaxe: a
BATL: a
smrt3099: b
Chanzelun1996: b
SBS9231S: a
d143b2:
b
SBS Transit
and SMRT:
a
TIB770T:
a
Samuel Lee:
b
Call4ljw: b
SMRT/SBS
Transit:
a
who get
the correct
guess will get 50% discount if you ride EWL/NSL.
T&C
apply
now pasir ris station platform below has those things too..
Originally posted by Kawac151:now pasir ris station platform below has those things too..
What thing?
Some Lakeside PSDs still in Stage 2 (the end of the platforms).
Originally posted by SBS9067A:Some Lakeside PSDs still in Stage 2 (the end of the platforms).
It's counted as Stage 3 as long as one PSD is up in the station.
UPDATE : BBT SB has 21 sets of PSD and NB has 8 sets of PSD.
Originally posted by yellowflip999:What thing?
Go and see youyuan's pic on the previous page... you'll know what i'm talking about..
Originally posted by Kawac151:Go and see youyuan's pic on the previous page... you'll know what i'm talking about..
Why would there be those things when Pasir Ris already has operational hhpsds?
O'oh... Chinese Garden getting ready to install PSD soon... not just soon.. VERY SOON!
they will operate the HHPSD for these 4 bloody stations on the same day
BGB will operate it soon (:
Clementi psds still haven't operate..
Originally posted by Bus and Train LoVuR:UPDATE : BBT SB has 21 sets of PSD and NB has 8 sets of PSD.
I counted 20?
Originally posted by yellowflip999:Why would there be those things when Pasir Ris already has operational hhpsds?
I kinda agree...I think those things should be in Tampines, not pasir ris..
Originally posted by Kawac151:I kinda agree...I think those things should be in Tampines, not pasir ris..
i don't think pasir ris have those things. expo, tanah merah and bedok have those things, but the rest not really sure.
PLEASE UPDATE:
move Eunos to stage 2, smrt3099 saw black/yellow panels on EB plaform
Originally posted by Khairiano:PLEASE UPDATE:
move Eunos to stage 2, smrt3099 saw black/yellow panels on EB plaform
wow, that fast. will updates photo and video in 2hrs time. stay tuned :)
Originally posted by Call4ljw:I counted 20?
You are right , because the front PSD have bigger doors.
Originally posted by youyuan:Eunos Station
Wow. fast...
Originally posted by Kawac151:Wow. fast...
less than 2hrs :)
Originally posted by youyuan:Eunos Station
wooo.. very nice!
Originally posted by youyuan:
video is up...
Paya Lebar (Black Lines)

I suppose paya lebar would be next...
Look out mfor BDK, TNM and EXPO soon
Originally posted by youyuan:Paya Lebar (Black Lines)
I suppose paya lebar would be next...
0.o Yeah. Last week when i pass by there, there wasn't any markings.