Installation of half-height PSDs in above-ground MRT stations
Total of 27 sets per platform
Installed and Working:
1. PSR - 54 (LIVE as of 01/11/09)
2. YIS - 54 (LIVE as of 02/12/09)
3. JUR - 108 (LIVE as of 18/12/09)
Installing PSDs (3rd Stage)
01. Clementi (EB - 25 + WB - 25 = 50 --- 01/06/10)
02. Bukit Gombak (NB - 25 + SB 25 = 50 --- 04/06/10)
03. Lakeside (EB - 25 + WB - 25 = 50 --- 06/08/10)
04. Bukit Batok (NB - 25 + SB - 25 = 50 --- 25/07/10)
Black-Yellow Panel (2nd Stage)
01. Chinese Garden
02. Eunos
03. Paya Lebar
Red Markings (1st Stage)
01. Joo Koon
02. Pioneer
03. Boon Lay
04. Dover
05. Buona Vista
06. Commonwelth
07. Queenstown
08. Redhill
09. Kallang
10. Aljunied
11. Kembangan
12. Bedok
13. Tanah Merah
14. Simei
15. Tampines
16. Choa Chu Kang
17. Yew Tee
18. Kranji
19. Marsiling
20. Woodlands
21. Khatib
22. Yio Chu Kang
23. Ang Mo Kio
Updates:
03/08/10: Paya Lebar moved from 1st stage to 2nd stage
10/07/10: Eunos moved from 1st stage to 2nd stage
24/06/10 : Bukit Batok moved from 2nd stage to 3rd stage
08/06/10: Lakeside moved from 2nd stage to 3rd stage
02/05/10: Kranji, Marsiling and Woodlands added on 1st stage
01/05/10: Bukit Gombak moved from 2nd stage to 3rd stage
14/04/10: Khatib added on 1st Stage
28/03/10: Clementi moved from 2nd Stage to 3rd Stage
21/03/10: Yew Tee added on 1st stage
15/03/10: Ang Mo Kio added on 1st stage
14/03/10: Yio Chu Kang added on 1st Stage
13/03/10: Kallang, Aljunied, Paya Lebar, Eunos, Bedok, Kembangan and Simei
added on 1st stage
04/03/10: Choa Chu Kang added on 1st stage
26/02/10: Tampines, Dover, Commonwelth, Queenstown, Buona Vista & Rehill
added on 1st stage
23/02/10: Pioneer & Tanah Merah added on 1st stage
12/02/10: Lakeside moved frm 1st stage to 2nd stage
09/02/10: Bukit Gombak moved from 1st stage to 2nd stage
06/02/10: Bukit Batok moved from 1st stage to 2nd stage
Joo Koon & Bukit Gombak added on 1st stage
31/01/10: Admiralty removed from 2nd stage
30/01/10: Chinese Garden moved from 1st stage to 2nd stage
Admiralty added on 2nd stage
---------------------------------------------------------------------------------------------------------------
Guessing Which Station In The East will Get HHPSD first?
(Do Not Include PSR) Up to 3 Guesses per person
(Closing Date : OVER )
Khairiano - Tanah Merah, Expo & Tampines
Bus and Train LoVuR - Kallang & Paya Lebar
LTnF1fan - Tampines, Bedok & Kallang
BiminiRosy - Tampines, Tanah Merah & Paya Lebar
smrt3099 - Expo, Bedok & Eunos
Scania96 - Bedok, Paya Lebar & Tampines
TIB770T - Eunos,Tanah Merah &Tampines
Samuel Lee - Tampines, Bedok & Paya Lebar
Chanzelun1996 - Eunos, Tampines & Kallang
Kawasaki C751B - Tanah Merah, Paya Lebar & Bedok
jayh272416 - Bedok, Tampines & Paya Lebar
SBS n SMRT - bedok, tanah merah & paya lebar
Paya Lebar Station

looks like PSD is going to be build soon...
Originally posted by youyuan:Paya Lebar Station
looks like PSD is going to be build soon...
wads in there? i thought psd they always keep under escalator?
Originally posted by Kawac151:This is bukit batok station, right?
looking at the picture... its at bukit batok station..
until today Lakeside stuck at 46th set.. the small 4 sets still relaxing under the escolator...
Originally posted by Khairiano:
looking at the picture... its at bukit batok station..
until today Lakeside stuck at 46th set.. the small 4 sets still relaxing under the escolator...
Dunno when they are going to install them. As for Clementi, still the same.
Originally posted by Kawac151:Dunno when they are going to install them. As for Clementi, still the same.
1 month plus aready... After 2 months, still the same
Bedok is going to build PSD already...

more PSD stuff on the right of the station.

Originally posted by youyuan:Bedok is going to build PSD already...
more PSD stuff on the right of the station.
Now shud have yellow panels?
Originally posted by SBS8945Y:
Now shud have yellow panels?
no, if have i will be the first one to know.
Black/yellow panels spotted at PYL EB
Paya Lebar
its official, black-yellow panel as of today...



Looks like PYL is next..
Latest Update: Lakeside got 50 sets..
Originally posted by Khairiano:Latest Update: Lakeside got 50 sets..
WHEE ![]()
Kallang is housing PSDs at the concourse level alr.
I hope expo wont get it soon, still a good place for CGL pics when its very quiet
Originally posted by jcqh:Kallang is housing PSDs at the concourse level alr.
serious...omg
Today's morning at Lakeside
a PSD set..
PSD wiring
zoom to the message at the caution whiteboard..
TO Doors Bukit Gombak

EW8 Paya Lebar - Black-Yellow Panel

Platform B - Incomplete
Chinese Garden hasn't installed PSD yet...good.
i wonder what happens when ya lean on the PSD doors.
Originally posted by alstom metropolis:Chinese Garden hasn't installed PSD yet...good.
i wonder what happens when ya lean on the PSD doors.
Nothing would happened. If it fall apart and land on the tracks. Jialat lio, HHSPDs failed its #1 function
Update at Lakeside