Originally posted by TIB1051D:CNG:
EB - 2 panels
WB - 22 to 23 panels
WB installm really fast..=D.
Installation of half-height PSDs in above-ground MRT stations
Total of 27 sets per platform
Installed and Working:
1. PSR - 54 (LIVE as of 01/11/09)
2. YIS - 54 (LIVE as of 02/12/09)
3. JUR - 108 (LIVE as of 18/12/09)
4. CLE - 54 (LIVE as of 16/08/10)
5. BGB - 54 (LIVE as of 16/08/10)
Installing PSDs (3rd Stage)
01. Lakeside (EB - 27 + WB - 27 = 54 --- 28/08/10) - awaiting for operation
02. Bukit Batok (NB - 27 + SB - 27 = 54 --- 27/07/10) - awaiting for operation
03. Chinese Garden (EB - 23 + WB - 23 = 46 --- 28/08/10)
Black-Yellow Panel (2nd Stage)
01. Eunos
02. Paya Lebar
Red Markings (1st Stage)
01. Joo Koon
02. Pioneer
03. Boon Lay
04. Dover
05. Buona Vista
06. Commonwelth
07. Queenstown
08. Redhill
09. Kallang
10. Aljunied
11. Kembangan
12. Bedok
13. Tanah Merah
14. Simei
15. Tampines
16. Choa Chu Kang
17. Yew Tee
18. Kranji
19. Marsiling
20. Woodlands
21. Khatib
22. Yio Chu Kang
23. Ang Mo Kio
Updates:
16/08/10: Clementi and Bukit Gombak moved from 3rd Stage to LIVE STAGE!
14/08/10: Chinese Garden moved from 2nd stage to 3rd stage
03/08/10: Paya Lebar moved from 1st stage to 2nd stage
10/07/10: Eunos moved from 1st stage to 2nd stage
24/06/10 : Bukit Batok moved from 2nd stage to 3rd stage
08/06/10: Lakeside moved from 2nd stage to 3rd stage
02/05/10: Kranji, Marsiling and Woodlands added on 1st stage
01/05/10: Bukit Gombak moved from 2nd stage to 3rd stage
14/04/10: Khatib added on 1st Stage
28/03/10: Clementi moved from 2nd Stage to 3rd Stage
21/03/10: Yew Tee added on 1st stage
15/03/10: Ang Mo Kio added on 1st stage
14/03/10: Yio Chu Kang added on 1st Stage
13/03/10: Kallang, Aljunied, Paya Lebar, Eunos, Bedok, Kembangan and Simei
added on 1st stage
04/03/10: Choa Chu Kang added on 1st stage
26/02/10: Tampines, Dover, Commonwelth, Queenstown, Buona Vista & Rehill
added on 1st stage
23/02/10: Pioneer & Tanah Merah added on 1st stage
12/02/10: Lakeside moved frm 1st stage to 2nd stage
09/02/10: Bukit Gombak moved from 1st stage to 2nd stage
06/02/10: Bukit Batok moved from 1st stage to 2nd stage
Joo Koon & Bukit Gombak added on 1st stage
31/01/10: Admiralty removed from 2nd stage
30/01/10: Chinese Garden moved from 1st stage to 2nd stage
Admiralty added on 2nd stage
---------------------------------------------------------------------------------------------------------------
Guessing Which Station In The East will Get HHPSD first?
(Do Not Include PSR) Up to 3 Guesses per person
(Closing Date : OVER )
EW26 Lakeside - Tanah Merah, Expo & Tampines
Bus and Train LoVuR - Kallang & Paya Lebar
LTnF1fan - Tampines, Bedok & Kallang
BiminiRosy - Tampines, Tanah Merah & Paya Lebar
smrt3099 - Expo, Bedok & Eunos
Scania96 - Bedok, Paya Lebar & Tampines
TIB770T - Eunos,Tanah Merah &Tampines
Samuel Lee - Tampines, Bedok & Paya Lebar
Chanzelun1996 - Eunos, Tampines & Kallang
Kawasaki C751B - Tanah Merah, Paya Lebar & Bedok
jayh272416 - Bedok, Tampines & Paya Lebar
SBS n SMRT - bedok, tanah merah & paya lebar
If i counted correctly, EB got 17.
Tampines MRT

i suspect this is PSD...
I wonder what those things at PSR are....
The first TO door at Lakeside went up today. Shouldn't be long until they become operational now.
Originally posted by mrtdude5:The first TO door at Lakeside went up today. Shouldn't be long until they become operational now.
Don't tell me lakeside PSD is in operation now??
Originally posted by EW26 Lakeside:Don't tell me lakeside PSD is in operation now??
Not as of RIGHT NOW, of course. To my knowledge, only one of the TO doors has gone up (WB HW).
Originally posted by mrtdude5:Not as of RIGHT NOW, of course. To my knowledge, only one of the TO doors has gone up (WB HW).
phew.....
Bukit batok already installing TO door...so more than 50 surely.
Installing very fast...i guess in no time all 3 will run together.
BTW, chinese garden all without top now lol.
I think BBT will operate soon
Originally posted by smrt3099:I think BBT will operate soon
maybe in one or two days time??
Originally posted by EW26 Lakeside:maybe in one or two days time??
hope so
8 months M.I.A for operation of PSDs..........
All four TO doors are up at Lakeside.
CNG stn, both platform have 23 sets each
I think Kembangan PSD working soon...
Red Marking:
EW6 Kembangan



Video: http://www.youtube.com/watch?v=D30zoybWm0k
EW23 Clementi

EW29 Joo Koon?? - Red Marking?

All four TO doors up at BBT also..
Originally posted by Kawac151:All four TO doors up at BBT also..
Lakeside too.
Originally posted by c751bLoVuR:I think Kembangan PSD working soon...
Red Marking:
EW6 Kembangan
Video: http://www.youtube.com/watch?v=D30zoybWm0k
EW23 Clementi
EW29 Joo Koon?? - Red Marking?
All above ground stations that doesn't have HHPSD operating already has red markings.
$50 says Lakeside will have operational gates by Monday. =P
I'm guess the black-yellow panel coming .... Hope so.
I think both BBT and LKS will operate its PSD on monday, door stickers are up
Originally posted by mrtdude5:$50 says Lakeside will have operational gates by Monday. =P
i bet 50% discount ..
so become
$25 bukit batok
$25 Lakeside
will be operated THIS MONDAY!
I think HHPSD installation at eastern side are handled by another company for retrofitting
Total: SMRT has agreed 3 companies to do the installation job