Originally posted by youyuan:today was crazy on NSL, but haha i went to find out what happen :) and i got stuck in the train for abt 15mins. there was something wrong with the tracks and staff were on the tracks repairing i supposed, causing NB trains to be super slow and keep on stopping. Before khatib was 1min frequency and the train was super close. there was no yishun bound and amk middle platform was used. video coming up soon...need to edit alot.
Was on NB train towards Khatib around 2+pm (reservoir that stretch), when I saw a bright flash, heard loud thunder and the train came abruptly to a stop. Not sure if lightning struck the train or nearby track.
Train crawled to Khatib. When doors were closing, could hear a loud POOF and shortly after whitish smoke with burnt smell came into the carriage (from below the train). Everyone rushed out and train was put out of passenger service.
Some stupid delays on NSL, and usually are the C751bs that always lambat
AT 210pm i boarded 111/112 from SOM NB to TPY.. By then the LTE services has ended.. The last LTE train was ahead of it.. then 111/112 came and i boarded it until TPY then I alight. Seeing the next train at the RATIS shows nothing.. After that a CSO announced thru the PA saying that the next train to JUR will be arriving in 8 mins, sorry for the inconvenience caused.. I rmb when I was at SOM, the next JUR train arriving in 4mins. Come to TPY and next train arr in 8 mins. Suay ar.. After that 351/352 came, with alot of ppl.. Next train arr in 2 mins, then 335/336 came with less ppl..
SKLRT was delayed for about 3 hours this morning. Buses are deployed to ferry passengers.
Track fault announcement played again on NSL for trains heading to JUR
Originally posted by wenjie639:SKLRT was delayed for about 3 hours this morning. Buses are deployed to ferry passengers.
Cause?
Platform screen door at Jurong East Platform D (Door 24) spoilt again, manual instead. video coming...




Track fault video on Tuesday
[EXCLUSIVE TRACK FAULT] SMRT Track Fault - On North-South Line towards Jurong East (Northbound)
Originally posted by youyuan:Platform screen door at Jurong East Platform D (Door 24) spoilt again, manual instead. video coming...
Jurong East psds doors is like more prone to being faulty.
Around 11+ , i boarded a C751B @ the middle platform of JUR..i was standing at the door right behind the TO's cabin & i saw the TO struggling to unlock the cabin door using the key. When the door can't open, he reached for the bottom of the door to unlock again. When that fails, he looks frustated and finally enters the cabin using the back door... Guess the door is spoiled
107/108 came out from UPD during evening peak today. The floor is still wet and i supposed they wash the floor.


Originally posted by Dragonaxe:073/074 approached Paya Lebar EWL platform at high-speed and encountered train fault. And it was a female TO =P
Did it overrun the station?
Originally posted by jcqh:Did it overrun the station?
Overrun about 3cm, not much I say. It entered the station at 80km/h (aprox) and decelerate crazily until it came to a stop. AM somemore. Must be the slope from Aljunied to Paya Lebar.
took 107/108 yesterday evening. No announcment except door closing. TO use manual announcement for the whole journey from Chinese Garden to Pasir Ris. Rather a good TO, he was kind enough to announce at every station. but hmmmm the sound...haha.
[NO ANNOUNCEMENT] SMRT C151 107-108 - Train ride from Bedok to Tampines (Eastbound)
Originally posted by Dragonaxe:Overrun about 3cm, not much I say. It entered the station at 80km/h (aprox) and decelerate crazily until it came to a stop. AM somemore. Must be the slope from Aljunied to Paya Lebar.
3cm is abit only.
PSD glass shattered at Nicoll Highway Station:


Originally posted by wenjie639:PSD glass shattered at Nicoll Highway Station:
kns, i got caught for taking photo. say "protected places"...
Shattered Platform Screen Doors (Nicoll Highway)
i manage to recover the photos :) haha

On the way home just now (eastbound), miss the train at 11.40pm at paya lebar and waited for 8mins>. The last train to joo koon had already departed long before that. Passengers came back from jay chou concert realise that there was no more trains services....alot of them went out of the station. But after the eastbound train left, 1 min later 033/034 drive thru paya lebar as DNB. I wonder hmmmm NE shuttle train services going back changi depot. At 11.50pm, suddenly...wah how come still got westbound trains one. i though no more already...and 033/034 pull in and i was suprised. wow smrt is willing to have a last train at 11.50pm. I suppose it went to eunos and did a turnaround and came back. by the time i left paya lebar eastbound at 12.00am, 033/034 was still at the platform...
Circle Line 17 April 2010 :)
05.30am @ Paya Lebar Station



according to my friends, the EWL, frm BNL to JUR, there's a train delay this morning.
NEL train fault
on NSL this morning, trains are also badly lambat today, causing a huge surge crowd at AMK
Originally posted by SBS8730A:on NSL this morning, trains are also badly lambat today, causing a huge surge crowd at AMK
what happened?