Commissioning of Signalised Junction of One-North Gateway / Portsdown Road and One-North Gateway / One-North Link
The Land Transport Authority will be commissioning the signalised junction of One-North Gateway / Portsdown Road and One-North Gateway / One-North Link on 9 May 2008 at 10.30am and 11am respectively.
Motorists are advised to drive carefully when approaching the junction and to observe traffic signal indications. Enforcement officers will be deployed at the signalised junction to guide motorists.
Please refer to the attached location map.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Installation Of Red-Amber-Green Traffic Lights At Junction Of North Canal Road / New Bridge Road / Eu Tong Sen Street / Merchant Road
The Land Transport Authority will be installing Red-Amber-Green (RAG) traffic lights at the junction of North Canal Road / New Bridge Road / Eu Tong Sen Street / Merchant Road on 27 May 2008 from 10.30am.
The RAG traffic lights will be installed to control right turning movement from North Canal Road to Eu Tong Sen Street. A lighted red arrow is a stop signal for motorists turning right, while a lighted amber arrow indicates that motorists must get ready to stop. A lighted green arrow indicates that motorists can proceed to turn right.
An enforcement officer will be deployed to guide motorists and pedestrians during the modification works. Motorists are advised to drive carefully and to follow the instructions of the wardens when approaching the junction.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Signalised Staggered Pedestrian Crossing at Pasir Ris Drive 1
The Land Transport Authority will be commissioning the signalised staggered pedestrian crossing at Pasir Ris Drive 1 outside the Cerebral Palsy Centre on 30 May 2008 at 11am.
Motorists are advised to drive carefully when approaching the traffic signals and to observe the traffic signal indications. An enforcement officer will be deployed at the location to guide motorists.
Please refer to the attached location map.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Part-Time Signalised Control at Junction of Upper Serangoon Road / Upper Serangoon View
The Land Transport Authority will be commissioning the new part-time signalised control at the junction of Upper Serangoon Road / Upper Serangoon View on 6 June 2008 at 10.30am.
The new part-time traffic lights will operate from 6.30am to 7.30am on Mondays to Fridays except public holidays.
Motorists are advised to drive carefully when approaching the junction and to observe the traffic signal indications. Enforcement officers will be deployed at the location to guide motorists.
Please refer to the attached location map.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Traffic Signals at the Junction of Boon Lay Drive and Boon Lay Place
The Land Transport Authority will be commissioning the traffic signals at the junction of Boon Lay Drive and Boon Lay Place on Saturday, 28 June 2008 at 6.30 pm.
Motorists are advised to drive carefully when approaching the traffic signals and to observe the traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Signalised Junction of Airport Road / Tai Seng Avenue / Ubi Road 2
The Land Transport Authority will be commissioning the signalised junction of Airport Road / Tai Seng Avenue / Ubi Road 2 on Tuesday, 1 July 2008 at 10.30 am.
Motorists are advised to drive carefully when approaching the junction and to observe traffic signal indications.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Opening of Vehicular Bridge over Changi Creek
The Changi Coast Road bound carriageway of the new vehicular bridge over Changi Creek will open to traffic on 8 July 2008 at 1am. The other bound carriageway towards Loyang was opened to traffic on 10 June 2008.
With the full opening of the new vehicular bridge, the stretch of Telok Paku Road from the existing bridge to Nicoll Drive will be converted to a one-way road in the direction of Changi Coast Road. A new roundabout will also be created at the junction of Telok Paku Road and Nicoll Drive.
Information signs will be displayed to inform motorists of the opening. Motorists are advised to drive carefully and follow the traffic signs displayed.
Please refer to the attached map for more information.
Should motorists have any queries, they can contact the LTA hotline at 1800-Call LTA.
Temporary Traffic Diversion at TPE (PIE)
To facilitate road works, traffic along TPE (PIE), between Tampines Flyover and Api Api Flyover, will be diverted in three stages from 14 July 2008 for a period of one month.
Information signs will be placed along the affected roads to inform motorists of the works ahead.
Please refer to the attached maps for more information.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA
Temporary Traffic Diversion at TPE (SLE)
To facilitate road works, traffic along TPE (SLE), between Halus Bridge and Punggol East Flyover, will be diverted from 17 July 2008 for a period of one month.
Information signs will be placed along the affected roads to inform motorists of the works ahead.
Please refer to the attached maps for more information.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Temporary Road Diversion of Central Boulevard and Marina Boulevard
To facilitate the construction and completion of Bayfront Station and its associated tunnels for Downtown Line Stage 1, the first of the two phases of road diversions will be implemented on Sunday, 27 July 2008 at 11am.
Phase 1 of the road diversion will involve:
Phase 2 of the road diversion will involve another section of the road to Marina Bay Sands (IR) site office. It will be implemented in September 2008.
The traffic scheme for both phases of road diversions will remain in place until September 2009.
Traffic signages will be prominently displayed along the affected roads to alert and direct motorists.
Please refer to the attached map for more information.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Road Realignment along Bartley Road and Upper Paya Lebar Road
To facilitate road works, the Land Transport Authority (LTA) will be carrying out the following road realignments:
1. Bartley Road (towards Toa Payoh and Ang Mo Kio) from 3 August 2008, 10am.
2. Upper Paya Lebar Road (towards Upper Serangoon Road) from 3 August 2008, 2pm.
3. Upper Paya Lebar Road (towards Paya Lebar Road) from 8 August 2008, 10am.
Motorists are advised to drive carefully. Directional and information signs will be displayed to guide pedestrians and motorists.
Please refer to the attached map for more information.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
* bump *
Junction Improvement Works at TPE (PIE) Slip Road / Upper Changi Road North
The Land Transport Authority will be carrying out junction improvement works at TPE (PIE) slip road and Upper Changi Road North from end August 2008 to 2nd Quarter 2009.
The works involve constructing a 2-lane left turn slip road from TPE (PIE) to Upper Changi Road North, one additional lane along Upper Changi Road East, and other ancillary works.
The junction improvement, when completed, is expected to increase the capacity and improve the traffic flow in the area.
To facilitate the road widening, some trees will be affected. LTA will work closely with the National Parks Board (NParks) to remove / transplant these trees whenever possible. LTA will also work with NParks to landscape the completed section of the new road progressively.
We will ensure that inconvenience to motorists and other road users is kept to a minimum during the construction period.
Please refer to the attached map for more information.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Temporary Realignment of Bendemeer Road
To facilitate the construction of road tunnels as part of the Woodsville Interchange upgrading project, the stretch of Bendemeer Road between PIE and Whampoa North will be realigned closer to the former SCDF Camp. The junction of Bendemeer Road, MacPherson Road and Serangoon Road will also be signalised.
The realignment of Bendemeer Road will take effect from 1 September 2008 at 5am and will last for a period of about 3 years until the road tunnels are completed.
Traffic directions will remain unchanged during the road realignment.
Please refer to the attached map for more information.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Traffic Light Junction at Woodlands Industrial Park E7 / Woodlands Avenue 8
The Land Transport Authority will be commissioning the traffic light junction of Woodlands Industrial Park E7 / Woodlands Ave 8 on Monday, 8 September 2008 at 11am.
Motorists are advised to drive carefully when approaching the traffic signals and to observe traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Please refer to the attached location map.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Staggered Signalised Pedestrian Crossing at Boon Lay Way
The Land Transport Authority will be commissioning the staggered signalised pedestrian crossing at Boon Lay Way near Sungei Pandan Park Connector outside The Synergy on Wednesday, 10 September 2008 at 10am.
Motorists are advised to drive carefully when approaching the signalised pedestrian crossing and to observe traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Please refer to the attached location map.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Traffic Lights Junction of Sengkang East Way and Anchorvale Road
The Land Transport Authority will be commissioning the traffic lights junction of Seng Kang East Way and Anchorvale Road on Sunday, 14 September 2008 at 10am.
Motorists are advised to drive carefully when approaching the traffic signals and to observe traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Traffic Lights Junction of Sengkang West Way and Fernvale Road
The Land Transport Authority will be commissioning the traffic lights junction of Seng Kang West Way and Fernvale Road on Sunday, 14 September 2008 at 10am.
Motorists are advised to drive carefully when approaching the traffic signals and to observe traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Realignment of Central Boulevard
To facilitate the construction of Downtown Line Stage 1 (DTL1) Landmark Station and associated tunnels, a stretch of Central Boulevard will be realigned from 1 October 2008, Wednesday at 11am for a period of approximately three months.
Directional and information signs will be prominently displayed to alert and direct motorists.
Please refer to the attached map for more information.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Signalised Pedestrian Crossing at Jurong East Street 21
The Land Transport Authority will be commissioning the signalised pedestrian crossing at Jurong East Street 21 near IMM building on Friday, 10 October 2008 at 10am.
Motorists are advised to drive carefully when approaching the signalised pedestrian crossing and to observe traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Please refer to the attached location map.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Signalised Pedestrian Crossing at Upper Changi Road
The Land Transport Authority will be commissioning the signalised pedestrian crossing at Upper Changi Road near Simei Park Connector on Friday, 17 October 2008 at 10.30am.
Motorists are advised to drive carefully when approaching the signalised pedestrian crossing and to observe traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Please refer to the attached location map.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Signalised Pedestrian Crossing at Jalan Bukit Merah
The Land Transport Authority will be commissioning the signalised pedestrian crossing at Jalan Bukit Merah near Blk 162 on Wednesday, 5 November 2008 at 10am.
Motorists are advised to drive carefully when approaching the signalised pedestrian crossing and to observe traffic signal indications.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Traffic Lights Junction at Kitchener Road / Verdun Road
The Land Transport Authority will be commissioning the traffic lights junction at Kitchener Road / Verdun Road on Wednesday, 5 November 2008 at 11am.
Motorists are advised to drive carefully when approaching the traffic signals and to observe traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Please refer to the attached location map.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Commissioning of Traffic Lights Junction at Sengkang West Way and Jalan Kayu
The Land Transport Authority will be commissioning the traffic lights junction at Sengkang West Way and Jalan Kayu on Wednesday, 5 November 2008 at 11am.
Motorists are advised to drive carefully when approaching the traffic signals and to observe traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.
Converting of Traffic Lights Junction at Sengkang West Way and Fernvale Road from T-Junction to Cross-Junction
The Land Transport Authority will be converting the traffic lights junction at Sengkang West Way and Fernvale Road from a T-junction to a cross-junction on Wednesday, 5 November 2008 at 11am.
Motorists are advised to drive carefully when approaching the traffic signals and to observe traffic signal indications.
Enforcement officers will be deployed at the location to guide motorists.
Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.