Originally posted by SBS7322B:LOL. Just spam red bars.
It is very basic. The entire roof used 1 csv file and 2 png files. Total size: 29.0kB.
Originally posted by joeyfjj:It is very basic. The entire roof used 1 csv file and 2 png files. Total size: 29.0kB.
Most likely you're going to need another 2 png files for the "base".
Originally posted by yellowflip999:Most likely you're going to need another 2 png files for the "base".
Nope. I'm thinking of true 3D faces for it.
Originally posted by joeyfjj:Nope. I'm thinking of true 3D faces for it.
I dunno how to do that but I wanna apply that to the poles of the C751B.
Originally posted by SBS7322B:I dunno how to do that but I wanna apply that to the poles of the C751B.
Use paint, lol.
Originally posted by yellowflip999:Use paint, lol.
It requires notepad and Microsoft Excel my friend.
Originally posted by SBS7322B:It requires notepad and Microsoft Excel my friend.
Use paint for the basic image structure. Then notepad to code it out. Lol!!
Microsoft Excel? Another $$ software, although everyone is likely to have it. BTW, what is the use of Excel for this BVE purpose?
Originally posted by Samuel Lee:Use paint for the basic image structure. Then notepad to code it out. Lol!!
Microsoft Excel? Another $$ software, although everyone is likely to have it. BTW, what is the use of Excel for this BVE purpose?
.CSV files. It's the default application although there are many applications that supports this format.
.csv are better coded via plain text-editing software then spreadsheet. There was once it destroyed the entire object and I needed my back up (Not NSL)...
Originally posted by SBS7322B:.CSV files. It's the default application although there are many applications that supports this format.
yep, but I always dont use Excel or other spreadsheet software for that (BVE CSV file)
Since this route is fairly complete, you should add in the run sounds from the Developer's Notes/Standard. Then I wouldn't have to hear my C751B motor sound only...... =X
Originally posted by SBS7322B:Since this route is fairly complete, you should add in the run sounds from the Developer's Notes/Standard. Then I wouldn't have to hear my C751B motor sound only...... =X
OK... After I get the new railtype and wall in. *Hint*
Notes and Changes Made in release 0.9:
Will be edited as the route progresses.
Development break
Originally posted by joeyfjj:Notes and Changes Made in release 0.9:
Will be edited as the route progresses.
- Non-essential crossovers will be added in 1.0
- All track distance moved forward by 10000 m.
Development break
- My development will stop from tomorrow onwards to 11 May, excluding weekends, due to exams.
What is moved forward by 10000m? Will the NSL cover the before JUR diverge tracks as well, even though touched a bit of EWL, because it is possible for TO to drive the train on the wrong side and doing this in BVE = derail, which is not possible at all.
Originally posted by joeyfjj:Notes and Changes Made in release 0.9:
Will be edited as the route progresses.
- Non-essential crossovers will be added in 1.0
- All track distance moved forward by 10000 m.
Development break
- My development will stop from tomorrow onwards to 11 May, excluding weekends, due to exams.
The reason for adding the 10000m to the track distance? Also, if you want a full Jurong East station, just 125m will do.
Originally posted by yellowflip999:The reason for adding the 10000m to the track distance? Also, if you want a full Jurong East station, just 125m will do.
Maybe he wants to cover the UPD?
Originally posted by Samuel Lee:Maybe he wants to cover the UPD?
Oh I see I see...
Originally posted by Samuel Lee:Maybe he wants to cover the UPD?
John and you (if I'm correct) requested the entire JUR, not just the front 25m. this 10000m will help. I will not cover UPD, but if anyone wants to do so, they will be able to do so more easily.
Mod edit: Delected the spelling error word and replace with the correct one. And did you mistaken 10000m as 1000m? 10000m is 10km, which is as good as the entire sector of Pasir Ris - Kembangan / Eunos including the overrun sector.
Originally posted by joeyfjj:John and you (if I'm correct) requested the entire JUR, not just the front 25m. this 10000m will hwlp. I will not cover UPD, but if anyone wants to do so, they will be able to do so more easily.
wow thanks. This will be the first milestone for a better NSL, such that if one day the Stage 3 ever completed, then that will be the time to do JUR (UPD) - Yew Tee / BSH or even MRB
Originally posted by Samuel Lee:wow thanks. This will be the first milestone for a better NSL, such that if one day the Stage 3 ever completed, then that will be the time to do JUR (UPD) - Yew Tee / BSH or even MRB
Stage 3?
Originally posted by yellowflip999:Stage 3?
Phase 3. Station and scenary completed.
Originally posted by joeyfjj:Notes and Changes Made in release 0.9:
Will be edited as the route progresses.
- Non-essential crossovers will be added by version 1.0.
- All track distance moved forward by 10000 m.
- Reorganisation and re-foldering of object folder. Done: 20100426.
Development break
- My development will stop from tomorrow onwards to 11 May, excluding weekends, due to exams.
Does that hint a release in end May?
Originally posted by Samuel Lee:Does that hint a release in end May?
**HINT** Follow us on Twitter. http://twitter.com/nslforopenbve
its Says there someone is planning a 16 May Release +_+ WHich is a day before my EXAMS>????@!!!???
Originally posted by Habbo lifehurts-forever:its Says there someone is planning a 16 May Release +_+ WHich is a day before my EXAMS>????@!!!???
Cos that is the Sunday AFTER my exam.