Originally posted by Samuel Lee:Swee, no issue. By the way, there are only 22 C151As and the upcoming Tuas depot can host 60 trains if I am not wrong.
BUMP and OT
22 C151As... That may mean 401/402 until 443/444...
Originally posted by joeyfjj:BUMP and OT
22 C151As... That may mean 401/402 until 443/444...
Relax, by then all the HFPSD have installed, so the train cannot be possibly involved in a incident regarding to track suiciders / accidents.
Originally posted by Samuel Lee:Relax, by then all the HFPSD have installed, so the train cannot be possibly involved in a incident regarding to track suiciders / accidents.
It can be involved, indirectly
You know? HHPSDs are cheap.
Originally posted by yellowflip999:It can be involved, indirectly
You know? HHPSDs are cheap.
Lol! Lentor incident. Speed a car, hit on the fence, and lagi best a 443 / 444 is coming towards Yioshun from Yio Chu Kang.
With new HHPSD adverts at JUR, what shall we do to the H2O advert?
Just a quick update.
I've been doing a C651 passing train, with its seats and all internal components reduced or removed, and I'll be doing ther viaducts soon. I won't give a release date (So there will be suspense, not disappointment).
That's all, good night.
Warning: Contains traces of delectably whitened text.
Originally posted by joeyfjj:Just a quick update.
I've been doing a C651 passing train, with its seats and all internal components reduced or removed, and I'll be doing ther viaducts soon. I won't give a release date (So there will be suspense, not disappointment).
That's all, good night.
Warning: Contains traces of delectably whitened text.
Passing train? Whats that? Does that mean u r doing the sound as well?
BTW, after completion, please apply ur changes to the existing adverts as well / original version update. (V1.1?)
So I take u as main developer for C651?
The reason why I asked this is because I will be planning to do an advert on C651 since I got photos for it.
Originally posted by Samuel Lee:Passing train? Whats that? Does that mean u r doing the sound as well?
BTW, after completion, please apply ur changes to the existing adverts as well / original version update. (V1.1?)
So I take u as main developer for C651?
The reason why I asked this is because I will be planning to do an advert on C651 since I got photos for it.
He's only doing a Passing Train, not a train.
Screenshot.
Red = Things to be removed/changed.
Green = New stuff added/changed/updated.
Originally posted by yellowflip999:He's only doing a Passing Train, not a train.
O, actually a passing train, is as good as the C751B used in the Ang Mo Kio?
Originally posted by joeyfjj:Screenshot.
Red = Things to be removed/changed.
Green = New stuff added/changed/updated.
Wow, the viaducts with the actual image were cool, but too bad they wern;t featured on the NSL Line.
Just Asking, will the tracks be like willis CGL tracks?
Originally posted by kenneth1228:Wow, the viaducts with the actual image were cool, but too bad they wern;t featured on the NSL Line.
Just Asking, will the tracks be like willis CGL tracks?
I don't think so.....
Originally posted by kenneth1228:Wow, the viaducts with the actual image were cool, but too bad they wern;t featured on the NSL Line.
Just Asking, will the tracks be like willis CGL tracks?
I'm experimenting with a program I got called "SWITCH" (http://www.ruedes-bve-seite.de/programme.html) to create smooth pointwork (*aka tracks) and hand editing the output to match the BVESG track objects standard.
Originally posted by joeyfjj:I'm experimenting with a program I got called "SWITCH" (http://www.ruedes-bve-seite.de/programme.html) to create smooth pointwork (*aka tracks) and hand editing the output to match the BVESG track objects standard.
Object specialist.
Originally posted by Samuel Lee:Object specialist.
No. Only NSL co-developer. =D
OK. Do you want HQ pointwork and switches, or third rail first?
Originally posted by joeyfjj:OK. Do you want HQ pointwork and switches, or third rail first?
3rd rail. Coz either Willis or The Soon's object has implemented the 3rd rail, something the EWL will bring in in the next release. Oh yeah, try download that lol.
Updates on the viaduct
The viaduct are mainly converted to the "new" objects by The Soon, with some "legacy" viaducts left at the crossovers, awaiting customised viaduct objects.
Joey, I'm lazy to ask you on msn, but do you want the "The train at Platform B, terminates it's service at Bishan Interchange" announcement?
Originally posted by joeyfjj:Updates on the viaduct
The viaduct are mainly converted to the "new" objects by The Soon, with some "legacy" viaducts left at the crossovers, awaiting customised viaduct objects.
By the way, the EWL WB got some viaducts. Maybe u try if that suits u or not.
Originally posted by Wanmah 10:hope the developers will develop the jurong east modification project
This is not suspected yet, maybe when the JEMP finally commences, then it may be worked on, because at the end of the tracks heading towards Bukit Batok, there are gates which are green in colour, and the tracks aren't placed yet.
Originally posted by Wanmah 10:@kenneth1228 thanks for the comment. we must wait until the jemp finishes constructing
Yes, its true, because the JEMP, when the train is heading towards BBT, there will be a crossover, because the viaducts stop before the Short Highway, then the tracks haven't been placed, so...