Originally posted by Boylush:Is it your photo?
Added credits.
Originally posted by MilesTailsPrower:Added credits.
Edited your post. User is motsg.
Must we create a new topic named:
[(Open)BVE] Off-topic Crapbox II!
As Crapbox I (Crapbox 1) will reach 80 pages soon?
Originally posted by SBS9067A:Must we create a new topic named:
[(Open)BVE] Off-topic Crapbox II!
As Crapbox I (Crapbox 1) will reach 80 pages soon?
Nope. I thought no page limit? Or at least, not at 80?
Originally posted by SBS9067A:Must we create a new topic named:
[(Open)BVE] Off-topic Crapbox II!
As Crapbox I (Crapbox 1) will reach 80 pages soon?
No need lah. I saw that the bus forums got more than 2000 posts. There's no need of a Second Crapbox.
Originally posted by Bngauw:No need lah. I saw that the bus forums got more than 2000 posts. There's no need of a Second Crapbox.
Okay. Okay.
I am recreating the openBVE network map once again so all developers post route details, like the terminus for the route (for the next release)...
Note: Please tell me the details, if possible, by Sunday? If you haven't told the details then I will still put on the map but don't blame me for inaccuracies.
Originally posted by jerryonhere:I am recreating the openBVE network map once again so all developers post route details, like the terminus for the route (for the next release)...
You mean the whole Openbve Singapore creations (eg.The Riverdale city , Singapore,Woodbridge city,etc.)In case , my nsx starts from Woodbridge station(Woodbridge city , at the heart of the country) to Middle Park Interchange(Also in the heart of Riverdale city)
Originally posted by Boylush:
You mean the whole Openbve Singapore creations (eg.The Riverdale city , Singapore,Woodbridge city,etc.)In case , my nsx starts from Woodbridge station(Woodbridge city , at the heart of the country) to Middle Park Interchange(Also in the heart of Riverdale city)
Non-fictional routes, in SG.
Originally posted by jerryonhere:Non-fictional routes, in SG.
kk.
Here are the Harbourvale Routes :D (Currently there's an IEL being developed by Dragon, so I suppose you could link both systems up or something? The line runs from HL6 Central to CG2 Changi Airport. Harbourvale City is 200-300km northeast of Singapore, in the sea. :P However there's no need to link up both if you dunwan) I'm using this as an official template for my documentations too.
The lines are arranged in chronological order of line's official opening.
Harbourvale Line
Termini: HL1 Harbourvale, HL16 Blackton Junction (future: HL18 Lower Ends)
Rolling Stock: C100A
Depot(s): Square Quays Depot, District Depot
Length of line: 11km
Duration between termini: 21 minutes
Number of closed stations: Zero
Random Fact: The Harbourvale Line was the first line in the city to be opened! :D
Airport Express Line
Termini: AE1 Stadium, AE4 East Harbour
Rolling Stock: C100B
Depot(s): South Coast Depot
Length of line: 5km
Duration between termini: Approximately 10 minutes
Number of closed stations: Zero
Random Fact: The Airport Express Line was intended to be a branch from the Harbourvale Line.
North West Line [Under Construction]
Termini: NW1 South Coast, NW10 City Square
Rolling Stock: C100A
Depot(s): Square Quays Depot, District Depot
Length of line: To-be-confirmed
Duration between termini: To-be-confirmed
Number of closed stations: Zero
Random Fact: The line was built under HLRT's supervision until HCRT took over, thus the monotonous designs from NW1 to NW6.
Blackton Line [Under Construction]
Termini: BL1 Townsville, BL13 Promenade
Rolling Stock: C591
Depot(s): Caroye Depot
Length of line: NIL
Duration between termini: NIL
Number of closed stations: One, BL4
Random Fact: The tracks in this line never diverge and converge, they are always 8m apart from each other. The middle portion of the viaducts may be used for recreational purposes like a park along the tracks, obviously with fencing beside the tracks.
Evergreen Fields Line [Future]
Termini: EF1 East Harbour, EF15 City Square
Rolling Stock: C100C
Depot(s): Lexington Depot
Length of line: NIL
Duration between termini: NIL
Number of closed stations: Two, EF2 Lexington and EF13 Town Hall
Random Fact: The current structure and route of the line was derived from an abandoned line with the same name. Old tracks can be found in the undeveloped Evergreen Parks district, 1km east of Evergreen Fields. Evergreen Parks was scheduled for extremely heavy developement and this district was supposed to take over Central as the city's CBD area, but plans were shelved after three newly built buildings collapsed in less than a month due to the marine clay in that area.
Kegstone Line [Future]
Termini: KS1 Lowland, KS10 Gateway
Rolling Stock: C591
Depot(s): Caroye Depot
Length of line: NIL
Duration between termini: NIL
Number of closed stations: Zero
Random Fact: The current Kegstone Line was an accidental line. There were no plans for this line at all, even after the Harbourvale Line fully opened from HL1 to HL16.
City Line [Future]
Termini: NIL (Trains can switch directions seamlessly at the following stations: CT1 South Coast, CT9 Lowland, CT14 Shorevale, CT22 Promenade)
Rolling Stock: C398
Depot(s): South Coast Depot
Length of line: NIL, expected to be at least 30km long
Duration between termini: NIL
Number of closed stations: To-be-confirmed
Random Fact: The City Line will efficiently cut travelling time, as passengers who want to get to and fro areas within the outskirts of the city, they can take this line without having to go through and interchange at the city centre.
Originally posted by Nickgoh45:Here are the Harbourvale Routes :D (Currently there's an IEL being developed by Dragon, so I suppose you could link both systems up or something? The line runs from HL6 Central to CG2 Changi Airport. Harbourvale City is 200-300km northeast of Singapore, in the sea. :P However there's no need to link up both if you dunwan) I'm using this as an official template for my documentations too.
The lines are arranged in chronological order of line's official opening.
Harbourvale Line
Termini: HL1 Harbourvale, HL16 Blackton Junction (future: HL18 Lower Ends)
Rolling Stock: C100A
Depot(s): Square Quays Depot, District Depot
Length of line: 11km
Duration between termini: 21 minutes
Number of closed stations: Zero
Random Fact: The Harbourvale Line was the first line in the city to be opened! :DAirport Express Line
Termini: AE1 Stadium, AE4 East Harbour
Rolling Stock: C100B
Depot(s): South Coast Depot
Length of line: 5km
Duration between termini: Approximately 10 minutes
Number of closed stations: Zero
Random Fact: The Airport Express Line was intended to be a branch from the Harbourvale Line.North West Line [Under Construction]
Termini: NW1 South Coast, NW10 City Square
Rolling Stock: C100A
Depot(s): Square Quays Depot, District Depot
Length of line: To-be-confirmed
Duration between termini: To-be-confirmed
Number of closed stations: Zero
Random Fact: The line was built under HLRT's supervision until HCRT took over, thus the monotonous designs from NW1 to NW6.Blackton Line [Under Construction]
Termini: BL1 Townsville, BL13 Promenade
Rolling Stock: C591
Depot(s): Caroye Depot
Length of line: NIL
Duration between termini: NIL
Number of closed stations: One, BL4
Random Fact: The tracks in this line never diverge and converge, they are always 8m apart from each other. The middle portion of the viaducts may be used for recreational purposes like a park along the tracks, obviously with fencing beside the tracks.Evergreen Fields Line [Future]
Termini: EF1 East Harbour, EF15 City Square
Rolling Stock: C100C
Depot(s): Lexington Depot
Length of line: NIL
Duration between termini: NIL
Number of closed stations: Two, EF2 Lexington and EF13 Town Hall
Random Fact: The current structure and route of the line was derived from an abandoned line with the same name. Old tracks can be found in the undeveloped Evergreen Parks district, 1km east of Evergreen Fields. Evergreen Parks was scheduled for extremely heavy developement and this district was supposed to take over Central as the city's CBD area, but plans were shelved after three newly built buildings collapsed in less than a month due to the marine clay in that area.Kegstone Line [Future]
Termini: KS1 Lowland, KS10 Gateway
Rolling Stock: C591
Depot(s): Caroye Depot
Length of line: NIL
Duration between termini: NIL
Number of closed stations: Zero
Random Fact: The current Kegstone Line was an accidental line. There were no plans for this line at all, even after the Harbourvale Line fully opened from HL1 to HL16.City Line [Future]
Termini: NIL (Trains can switch directions seamlessly at the following stations: CT1 South Coast, CT9 Lowland, CT14 Shorevale, CT22 Promenade)
Rolling Stock: C398
Depot(s): South Coast Depot
Length of line: NIL, expected to be at least 30km long
Duration between termini: NIL
Number of closed stations: To-be-confirmed
Random Fact: The City Line will efficiently cut travelling time, as passengers who want to get to and fro areas within the outskirts of the city, they can take this line without having to go through and interchange at the city centre.
Great info! Although I did say above that it was only for SG routes only, I might try to do a map of all the countries :)
Maybe a more rectangular-y shaped map since 200-300km in pixel terms, means doing a over 3000pixels (length or height) map.
Originally posted by jerryonhere:Great info! Although I did say above that it was only for SG routes only, I might try to do a map of all the countries :)
Maybe a more rectangular-y shaped map since 200-300km in pixel terms, means doing a over 3000pixels (length or height) map.
Okay.Err.I try compile then give u by this weekend if possible
Dear all, i have read your discussion on the thread <*** A New Forum> by Joey, and willischong have finally set up the forum with our own domain. Therefore we would like to invite everyone over to the forum http://forums.sgtrains.com/index.php, for Public Beta Test. Feedbacks & Suggestions are most welcomed.
Originally posted by SBS9231S:Dear all, i have read your discussion on the thread <*** A New Forum> by Joey, and willischong have finally set up the forum with our own domain. Therefore we would like to invite everyone over to the forum http://forums.sgtrains.com/index.php, for Public Beta Test. Feedbacks & Suggestions are most welcomed.
... Do you need to do that? There's already Singapore Transport.
Originally posted by C830/C751B/C951 Fan:... Do you need to do that? There's already Singapore Transport.
It's official by Willis Chong. But this is a Trains Only Forum. No Buses. Just trains. OpenBVE Is Also Included.
Originally posted by Bngauw:
It's official by Willis Chong. But this is a Trains Only Forum. No Buses. Just trains. OpenBVE Is Also Included.
Oh. What about Singapore Transport?
Then what happens to this forum?
Originally posted by Zameer Sufyan:Then what happens to this forum?
All shall still be used. It depends on which one is more favourable.
Originally posted by Zameer Sufyan:Then what happens to this forum?
Still in use.
Originally posted by Bngauw:
All shall still be used. It depends on which one is more favourable.
Of course to me 65% SGF 35% SGTrains.
I think Boylush should be a moderator as the "How to become a moderator" rules said that if any members had the potential of developing a route/train, he/she will become moderator.
Originally posted by C830/C751B/C951 Fan:Originally posted by Bngauw: It's official by Willis Chong. But this is a Trains Only Forum. No Buses. Just trains. OpenBVE Is Also Included. Oh. What about Singapore Transport?
SIngapore Transport has been closed. someday once everything here is moved over, we might close the forum here as well.