Downtown Line and Cross Island Line this 2 power !!!!
but knn 2013-2030 , 17 years ............. lin peh 60 liao .... maybe handover NRIC liao .
Maybe ct2220 go first , hahahahaha
Maybe first Lee guarantee go first ......... perhaps second Lee also bye bye liao .
with this two lines on ....
bus drivers also tua ki , not only taxi drivers .
U think bus companies not tua ki ? Bus companies also ki siow at 2030 .
Originally posted by Poolman:but knn 2013-2030 , 17 years ............. lin peh 60 liao .... maybe handover NRIC liao .
Maybe ct2220 go first , hahahahaha
Maybe first Lee guarantee go first ......... perhaps second Lee also bye bye liao .
2030。。。。to me there's too long liao.
BY then, My NRIC punched hole liao.
2030 CDG Cab :
who care, by then me 70 retired already, and PAP still 85 sit????
SG would have sunken by then
or EOTW would have come, twice.
so no need worry
Originally posted by Poolman:but knn 2013-2030 , 17 years ............. lin peh 60 liao .... maybe handover NRIC liao .
Maybe ct2220 go first , hahahahaha
Maybe first Lee guarantee go first ......... perhaps second Lee also bye bye liao .
by 2030 want to drive also cannot....lin gong 75 liao...
CCB I start a thread on this ganna deleted....SMLJ? Kelong? Or PM KUM LAN ONE AH????
SINGAPORE: Singapore
will have two new MRT lines, while three existing lines will be
extended. These will double the rail network stretch to 360 kilometres,
compared with the current 178 kilometres.
By then, eight in 10 households will have a train station within a 10-minute walk, compared with about six in 10 currently.
These plans for the rail network followed a review of the Land Transport Master Plan by the Land Transport Authority (LTA).
Transport
Minister Lui Tuck Yew announced the new developments when he visited
Chinatown Station of the Downtown Line on Thursday.
The new lines are the Cross Island Line (CRL) and Jurong Region Line (JRL).
The CRL will run from Jurong Industrial Estate and pass through
areas such as West Coast, Bukit Timah, Ang Mo Kio, Punggol and Pasir Ris
before ending in Changi. The 50-kilometre line, which is expected to be
completed by 2030, will be connected to all existing lines.
It is expected to relieve the load of the existing East-West and North-East lines and shorten journey times significantly.
Mr
Lui said: "The eastern leg of the CRL will also include a segment that
extends into the centre of Punggol. Residents in Punggol will be able to
take a short cut to Pasir Ris, which is a popular and much demanded
travel route, in only 10 to 15 minutes, compared to a 40 minute bus
journey that they experience today."
The other new line -- Jurong
Region Line -- will be completed in 2025. The 20-kilometre line will
pass through areas such as Jurong West, Jurong Industrial District, West
Coast, Choa Chu Kang and potential new developments in Tengah.
Those
travelling from the North to Jurong, like students of Nanyang
Technological University, can skip Jurong East Station on the East-West
Line.
The LTA will conduct environmental impact and engineering
studies to decide on the final alignment, the number of stations and the
type of systems that will run on the new lines.
Separately, three existing lines -- the Circle Line (CCL), Downtown Line (DTL) and North-East Line (NEL) -- will be extended.
The CCL will be four kilometres longer -- to close the link
between HarbourFront and Marina Bay stations and save commuters the
hassle of making multiple transfers. The extension, which will also pass
through Keppel, is expected to be completed by 2025.
The DTL
will be two kilometres longer by 2025 -- to run through the East Coast
area. It will be connected to the East West Line and the Eastern Region
Line, which will be ready by 2020, so that commuters can transfer
between the Downtown Line and Eastern Region Line in the east.
As
for the NEL, two kilometres will be added by 2030 -- in tandem with new
developments in Punggol -- to serve Punggol North, including the new
Punggol Downtown.
The LTA is also exploring the possibility of an
additional station between Sembawang and Yishun stations on the
North-South Line, in anticipation of future developments in the area.
Mr Lui said all these changes promise not just faster and more convenient travel.
He
said: "We will also have a more resilient network that can better
mitigate disruptions in our MRT system and also allow us to shut down
parts of the network for longer durations to carry out improvement works
without causing too much inconvenience to commuters."
Mr Lui
said the vision for Land Transport in the coming years is to have better
connectivity and service to support an inclusive, liveable community.
He said the government will invest heavily to achieve this and provide a much better travel experience for Singaporeans.
He assured Singaporeans will feel a marked difference when new rail lines and new trains come into operation
Like this dig and dig, drill here and bore there, Singapore below become a Beehive liao, anytime one knock only, all soil and building collapse liao..below hollow with holes.
Originally posted by Poolman:but knn 2013-2030 , 17 years ............. lin peh 60 liao .... maybe handover NRIC liao .
Maybe ct2220 go first , hahahahaha
Maybe first Lee guarantee go first ......... perhaps second Lee also bye bye liao .
Hopefully I can still be around to send 2 of you off, it will be my best honor to send free for you, but diesel still have to pay hor..
By 2030 or far before that..ppl will start to complain ...MRT over dig over built and so many B$$ contract benifit who...where to get $$ for daily/weekly/monthly/yearly maintainance..?
odds of tunnel collapse super high then.
So long way to go, just another election tactic. Not one of the new lines will be ready by their ready date. Definitely delayed.
10 years more, retire lor.
å“Žå“Ÿå“Ÿï¼�æ–°åŠ å�¡å°±é‚£ä¹ˆä¸€ä¸ª·å°�红点ï¼�
咱们现在神马都往上�展,神马世界最高的摩天轮,酒店。。。。。。
下�,就�能往下�展啦��然�去哪里�
兄弟å§�妹们,咱们也è¦�å�¯æ€œå�¯æ€œå°�æ�Žå�啊,他已ç»�是一个头两个大了ï¼�
Originally posted by Terry Young:odds of tunnel collapse super high then.
So long way to go, just another election tactic. Not one of the new lines will be ready by their ready date. Definitely delayed.
10 years more, retire lor.
retire??? Singapore got retire one meh??
Originally posted by bowah:
retire??? Singapore got retire one meh??
Why not !
My retirement ==>>
Originally posted by Ct2220:å“Žå“Ÿå“Ÿï¼�æ–°åŠ å�¡å°±é‚£ä¹ˆä¸€ä¸ª·å°�红点ï¼�
咱们现在神马都往上�展,神马世界最高的摩天轮,酒店。。。。。。
下�,就�能往下�展啦��然�去哪里�
兄弟å§�妹们,咱们也è¦�å�¯æ€œå�¯æ€œå°�æ�Žå�啊,他已ç»�是一个头两个大了ï¼�
��??? 大哥,我们�情��,那么是�,�情我们
他也�会怜悯我们...�好说..�情 ki lan
Originally posted by hammerhammer8888:CCB I start a thread on this ganna deleted....SMLJ? Kelong? Or PM KUM LAN ONE AH????
Sorry hor , not me delete hor ..... dun smlj also say me hor ....
Originally posted by Ct2220:Why not !
My retirement ==>>
Amen
i prefer the good old days.. the ns n ew line.. so easy easy.. now take mrt also need to study which line to take..lucky for me, i dun need to take mrt..
Originally posted by bowah:
Amen
What Amen �
I still need you to be my TD for my last trip.
the more they build, the more breakdown commuters get...
Originally posted by Poolman:
Sorry hor , not me delete hor ..... dun smlj also say me hor ....