A re do that was cancelled last Thursday .
Last Thursday ....... members who went and went off , u will be compensated 1.5 hours of $33 , as in $49.50 .
U will be paid $33 / hour this around .
5pm , wait for surveyor at Tai Sing MRT area .
U will be booked 3.5 hours running KPE up and down .
I need 12 drivers this round .
Morning no need to re do .
$33 excluding ERP .
Any members can help ?
Bros Chong Ah。。。。。。。。
Even last minutes cancell, Still have
Those members who went last Thursday , can help ?
Help them cos they also help us to ask for compensation of 1.5 x $33 from LTA .
Don't worry , when i say i will fight for u , leave it to me .
I'll fight with all my life for u .
I did promised the guys i'll fight for u , i did .
They offered 15 minutes , i said Nope .
They counter 30 minutes , i said Nope .
They booked me 3.5hour , it's fair we get 1.5hr back , they thought it's fair .
Just leave it to me .
I do thing u all no need worry .
U have to know me by now .
But it is not easy to negotiate and convince them to pay us $49.50 .
In this case , i can see LTA is no good . Not very good in handling the proposal .
I explain to them .
" If customers made 12 advance bookings from taxi company and taxi drivers aeroplane the job , if they complaint to LTA , what LTA will do ?"
'LTA will suspend the taxi drivers or even pok the driver ."
But LTA can cancell the job as they like ?
What attitude was that ?
Those who got my number , sms me a text by Monday if u can help .
Thanks a lot .
Got to get back to work now .
Grandma , dun worry , u are in .
U already in the list
Members Poolman is
Originally posted by Poolman:A re do that was cancelled last Thursday .
Last Thursday ....... members who went and went off , u will be compensated 1.5 hours of $33 , as in $49.50 .
U will be paid $33 / hour this around .
5pm , wait for surveyor at Tai Sing MRT area .
U will be booked 3.5 hours running KPE up and down .
I need 12 drivers this round .
Morning no need to re do .
Chief, this Thursday job I can make it.
members , it a tuesday .
Originally posted by Poolman:Those members who went last Thursday , can help ?
Help them cos they also help us to ask for compensation of 1.5 x $33 from LTA .
i said before all along , i am a fair guy . We dun eat people , also try not to let people eat , simple theories .
Pool, last wk, the in charge came abt 5.10pm. (correct me if i'm wrong). He gave me instruction that I need to start exactly at KPE entrance @ 5.30pm sharp. Meaning from Tai Seng MRT, I need to rush there n meet the time. Is this the scenario?
count me in!
Originally posted by Wantaxi:Pool, last wk, the in charge came abt 5.10pm. (correct me if i'm wrong). He gave me instruction that I need to start exactly at KPE entrance @ 5.30pm sharp. Meaning from Tai Seng MRT, I need to rush there n meet the time. Is this the scenario?
u are paid starting from 5pm ..... the rest let the surveyor decide things , cos the surveyors represent the surveyor company , and was brief on what to do , so we just drive .
This round 12 is doing KPE loopings .
A different 4 drivers will be sent for another assignments , i have 5 on my list , so u guys wont see the 4 guys at Tai Sing .
This 5 guys were despatch to do AYE cos this 4 guys from West side . Only Z/fiction stayed at East side .
Ah Lim , EuroCab and LV82 from Panjang , Cyben from Jurong . Z/fiction from Eunos .
Meeting place at Clementi Blk 322 , near to MRT station .
Need to ask Z/fiction if he can make it on time ???
Those who performed last tuesday's survey , thank u very much once again .
if not for the other assignment at Jurong side , which covered Tuesday , Wednesday and Thursday , i should have the payment coming in by last friday .
So payment will only come in after Thursday assignement , later today , i will get Z/fiction if can to collect for me .
Then i will cash out from bank and do transfer one by one .
Pls be patient , once i transfer i will sent sms to each and everyone of you .
Thanks guys .
I had spoken with survey company regarding last min cancellation , i insist compensation has to be made .
Our solution , both fair to all sides ....
two hours before assignments , there should be enough time for us to adjust our routine before turning up for the assignments .
So there will be no compensation , if they cancell it 2 hours before booking time .
Anything lesser than 2 hours notification , i considered it as last minute cancellation , compensation will be given .
So far , for the month of April , there will be no road survey .....
Have to wait until May .....
KPE tunnel survey as usual .....
Maybe after this survey , they will increase the speed limit inside the tunnel , or perhaps erecting an ERP gantry after linking up with Marina South underground expressway .
We dunno , so we just drive .
Originally posted by Poolman:So far , for the month of April , there will be no road survey .....
Have to wait until May .....
KPE tunnel survey as usual .....
Maybe after this survey , they will increase the speed limit inside the tunnel , or perhaps erecting an ERP gantry after linking up with Marina South underground expressway .
We dunno , so we just drive .
members , the account is checking the amount , won't be wrong , tmr z/fiction will represent us collect the cheque from them .
saw 2 boys with luminiscent green vest at exit of moulmein rd,also at sinaran drive junction with irrawady rd(near tan tock seng hospital medical ctr).i think they r doing survey for LTA.
Originally posted by foolsh_2000:saw 2 boys with luminiscent green vest at exit of moulmein rd,also at sinaran drive junction with irrawady rd(near tan tock seng hospital medical ctr).i think they r doing survey for LTA.
No related to tis thread